
EZ 1000 Series II Melter Part Manual
Chapter 5 Operating Instructions
©2019 by Crafco, Inc. All Rights Reserved………………..…………………………………..….Operating Instructions 5-19
5.14 Storing the Machine
Store the machine in an area where moisture cannot enter the heating system such as heat transfer
oil tank, etc. Extended down time can cause moisture build up in the heating tank.
Evidence that moisture has collected in the heat transfer oil is a constant popping noise. If this
popping noise is heard, warm the heat transfer oil to 300°F (149°C) for two to three hours to
evaporate the moisture. Failure to follow this procedure will cause the heat transfer oil to overflow
the tank resulting in possible machine damage and/or personal injury.
Best practice is to check in the material tank prior to starting the burner. If water is present, try and
remove as much as possible, heat the material to 300°F (149°C) for two to three hours to evaporate
the moisture. Failure to follow this procedure will cause the material to overflow the tank resulting in
possible machine damage and/or personal injury.
Store the machine for longer periods with the material tank empty.
Содержание Crafco 46200EB
Страница 1: ...Parts Manual 26458 Revision Q ...
Страница 4: ...EZ1000 Series II Melter Electric Hose PN 47600EC100 EZ1000 Series II Melter Electric Hose PN 46200EB ...
Страница 16: ......
Страница 18: ......
Страница 26: ......
Страница 48: ......
Страница 66: ......
Страница 196: ......
Страница 200: ......
Страница 201: ......
Страница 202: ... 2019 Crafco Inc ...