Arm Set-up Manual
©
2011, Equipois Inc.
29 of 32
All rights reserved.
101-9110 Rev E
•
Check to make sure no threads are visible be-
tween posts. If necessary, tighten to remove
any gaps
•
There should be clamp collars on both the top
and bottom of where the gimbal post attaches
to the zeroG arm. A Teflon washer should be
underneath the top collar.
•
Each clamp collar should be firmly seated with
screws tightened to 10 foot-lbs
•
Check jam nuts are seated and secure. If not,
tighten and add Blue Loctite
•
Check that counterweight set screw is secure.
If not tighten and ad Blue Loctite
Annual
P/N 400-1112*
•
Blue Loctite P/N 900-7001-
TL*
RECOMMENDED SPARE PARTS
QTY
DESCRIPTION
PART NUMBER
PRICE
zeroG4 Arm
1
Kit, Complete Maintenance Pack, zeroG4
101-5910
$621.00
Included in Maintenance Kit:
1
Tool Interface Sleeve
102-6280
1
Retainer Clip
900-9117
4
Disposable, Polyco Arm Cover
300-2100
1
Silicone Arm Cover
300-2200
2
Extreme Pressure Grease
900-7005-GR
1
O-Ring Grip Washer
101-6371
1
Buna O-Ring 18mm
900-9105
4
Bumper pads
900-9025-BP
1
Kit, Gas Spring, Long Shoulder
101-6250-02
2
Blue Loctite, 243, 10 mL
900-7001-TL
Available Separately:
1
Kit, Tool Interface Sleeve with Clip
102-6281
$42.50
1
Disposable, Polyco Arm Cover
300-2100
$26.50
1
Silicone Arm Cover
300-2200
$250.00
1
Extreme Pressure Grease
900-7005-GR
$24.00
1
Kit, Gas Spring, Long Shoulder
101-6250-02
$165.00
Fixed, Interface Mounting Block
1
Kit, Replacement 80/20 Bolts & Nuts
500-4164
$12.50
1
Quick Release Pin
900-9031-QP
$50.00