For this stage you will require:
(1) Frame Assembly (from previous stage)
(2) Tire and Rim
(2) Cotter Pins
(2) M21 Washers
Stage 3: Attaching Wheels
Place wheels on each spindle with
the grease nipple facing inwards.
Add an M21 washer and install cotter
pin through the hole in the end of the
axle for both wheels (see fig 10).
Ensure both tabs of the cotter pins are separated after placement.
Finally, grease wheel bearings with a grease gun, using grease nipples on
the inside of each wheel.
FIGURE 9
FIGURE 12
FIGURE 10
FIGURE 13
FIGURE 11
FIGURE 14
Place the hitch bar so that the
beveled edge faces down and
towards the back of the unit. Secure
in place using an M12 x 90 mm hex
head bolt 2 washers and an M12
locknut.
NOTE:
Washers are placed on the
outside of both sides of the channel.
Secure the Ball coupler in place using
two M12 x 80 mm hex head bolts and
two M12 locknuts and two
M12 Washers.
Using two M10 x 75 mm hex head
bolts, two M10 lock nuts and two
M10 washers, secure the
tipper latch in place.
For this stage you will require:
(1) Completed Assembly (from previous stage)
(1) Hitch Bar)
(1) Ball Coupler
(1) Tipper Latch
(1) M12 x 90 mm Hex Head Bolt
(2) M12 x 80 mm Hex Head Bolts
(4) M12 Washer
(3) M12 Lock Nut
(2) M10 x 75 mm Hex Head Bolts
(2) M10 Washers
(2) M10 Lock Nuts
Stage 4: Attaching Hitch