External Cable Completion
All external cabling is completed in this step.
Step
Description
Diagram
1.
Coil up and cable tie the additional
cabling for the boom and pressure
sensor cables and store underneath
the CPIM.
2.
Connect the supplied M12 4 metre
cable (CB001026) into the free
connection out of the right side of
the CPIM for the CCIM cable.
Run the cable out the hole under the
lift cylinder.
3.
Cable tie the CCIM, signal light, rear
camera and cutout harnesses
together along the side to the front
of the cabin.
30 of 53
Содержание Gen-3 LMS
Страница 5: ...Appendix B Reattach Ferrites 51 Indexes and Tables 52 VER 1805241756 5 of 53...
Страница 9: ...Illustration 1 Machine Boom VER 1805241756 9 of 53...
Страница 10: ...Illustration 2 Machine Chassis VER 1805241756 10 of 53...
Страница 15: ...Cable Reeler Mounting Position Illustration 3 Cable Reeler Mounting Position VER 1805241756 15 of 53...
Страница 43: ...Complete the system checklist once installation has been completed VER 1805241756 43 of 53...