background image

02172022JA                                                     

www.epvscreens.com

                                    

   U-00249                   3 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Frame Assembly 

Step 1

:  Place the included soft padded EPE sponge sheet on a clean area where the screen will be assembled. 

Step 2: 

Position the pieces of the frame on the EPE sponge in the arrangement shown below. 

 

 

 

Step 3: 

Insert 

center joint (a/b) 

connectors into 

one-half of the horizontal frame (B/C)

 and secure with the 

M4x7 

screws (M)

 as shown in the illustration below.  

 

Step 4: 

Connect the 

elbow joints (c/d)

 to the top and bottom sections of the vertical frame. Once inserted, connect 

the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame pieces are 

flush (no gaps). They should form perfect right angles.  

 

 

 

Item 

Parts List 

120

 

135

 

a. 

Center Joints- M4 (bottom position) 

b.

 

Center Joints-D5 (top position) 

c. 

Elbow Joints M4 (bottom position) 

d. 

Elbow Joints D5 (top position) 

e. 

Top

 

wall brackets 

g. 

M4x7 Screws  

32 

32 

h. 

Spring 

68 

78 

i. 

Spring Hook 

j. 

Bottom wall brackets 

k. 

Φ5x50 Wall Screws  

l. 

Hollow Wall anchors  

m. 

M4x4 Screws 

24 

24 

n. 

Angle cover 

o.

 

Center Support Bar 

p.

 

White gloves 

q. 

Spring 

r. 

Φ3 mm Long Iron (sides) rod/ Short rod (top/bottom) 

2/4 

2/4 

b. 

a. 

c. 

d. 

g.

b. 

a. 

d. 

c

Tip: The center joint (b) with the larger diameter holes should be on top.

 

Tip: The elbow joint (d) with the larger diameter holes should be on top.

 

Содержание EDGE FREE Sonic AT8 ISF eFinity Series

Страница 1: ...Sonic AT8 ISF which is a high resolution acoustically transparent front projection material for speaker placement behind the screen In order for the Sonic AT8 ISF to maintain its projection qualities...

Страница 2: ...Edge Trim Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a...

Страница 3: ...sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Item Parts List 120 135 a Center Joints M4 bottom position 6 6 b Center Join...

Страница 4: ...r corresponding lengths on each edge of the screen as shown below The short rods top bottom will overlap to secure a firm grasp in the middle areas Step 8 Carefully and gently place the assembled fram...

Страница 5: ...nd of the spring and secure inside the groove of the frame use the spring hook i to attach the spring to the grommet hole located on the screen material s outer edge in the following order Begin by fi...

Страница 6: ...the frame reposition the material so that it lies flat and wraps along the edge of the frame and reattach springs to the material Note Please make note of the yellow label and spring in the center of...

Страница 7: ...each corner of the frame as show in the illustration below Step 13 Install the springs q in each middle area to secure the bezel trim edge frame Wall Installation Step 14 Measure the overall length an...

Страница 8: ...Elite Prime Vision contact in your area visit www epvscreens com Model Size A Top Wall bracket distance A1 Bracket hole distance B Bottom Wall bracket distance B1 Bracket hole distance C Top Bottom Wa...

Отзывы: