background image

Super Parameter Programmer 

SPP-01 

Dear user: 

Thank you very much for selecting our product! 

This manual offers important information and suggestions about use and 

troubleshooting, etc. Please read this manual carefully before using the 

product.   

Warranty: 

The product is warranted to be free from defects for a period of 

two years from the date of shipment to the original end user.   

Содержание SPP-01

Страница 1: ...duct This manual offers important information and suggestions about use and troubleshooting etc Please read this manual carefully before using the product Warranty The product is warranted to be free...

Страница 2: ...ecommendation 2 3 Features 3 3 1 Features 3 3 2 Power Supply and Startup 5 4 Software Operation 7 4 1 Software Operating Environment 7 4 2 Software Installation and Uninstalling 7 4 3 Software Operati...

Страница 3: ...romagnetic interference Do not allow waterto enter the controller Do not disassembleor attempt to repairit 2 General Information 2 1 Product Characteristic Super parameter programmer SPP 01 is the sim...

Страница 4: ...software and then update thedevice s parameters through SPP 01 with easy one button Data transparent transmission function SPP 01 can be used as the communication converter to connect the device and S...

Страница 5: ...eserved K3 Toggle switch 3 On Power on Off Power off K4 Water proof key 4 Press the button Press the key to enter configuration mode theindicatorled is on click it again to update the configuration Pr...

Страница 6: ...riple with threeshort beeps Test The indicator light flashes for several times with onelong beep Note 1 Press and hold the button for three seconds to alternately turn on or turn offthe load in the te...

Страница 7: ...ation cable Update device configure USBinterface Connect to thePC with the CC USB USB 150U communication cable Update SPP01 configure RTC battery holder Battery for real time time clock Type CR1220 Ba...

Страница 8: ...from3 batteries sizeAAA Starting SPP 01 The SPP 01 is powered on by toggling K3 switch to ON Operating status Phenomena Normal startup The green light flashes oncewith one beep No data availablein SP...

Страница 9: ...NetFX40 4 2 Software Installation and Uninstalling Installing the software Open directory SPPPCSoftwareV3 77 and double click setup exe after the computerstart carry on the software gearing Uninstalli...

Страница 10: ...river and run Setup bat fileto install thedriver 3 Right click My computer Property Hardware Device manager to pop up adevice managerwindow seeing the figure below Note The serial port number selected...

Страница 11: ...to pop up configuration interface of SPP 01 2 The softwarewill automatically open the port afterselected serial port of SPP 01 thebutton caption will change from open port to closeport 3 The following...

Страница 12: ...guration into SPP 01 device a corresponding dialog box will be popped up to prompt whether loaded successfully or not Reading parameter data Ifthe configuration has been loaded to the SPP 0 click butt...

Страница 13: ...ck button to load corresponding TXT file to upload the configuration Control Parameter Battery type Battery type Notes Sealed default Fixed controlling voltage unable to be modified Gel Fixed controll...

Страница 14: ...ge Auto Auto 12V 24V 36V 48V Battery charging 100 100 SOC Mode Battery discharging 30 10 80 SOC Mode Note Battery charging voltage Battery discharge 10 or battery discharge value Battery charge 10 val...

Страница 15: ...uration 120 Min 120 Min 0 180 Min Boost Duration 120 Min 120 Min 120 Min 10 180 Min Note The following rules must be observed when modify the parameters valuein user battery type factory default value...

Страница 16: ...l load can be switched by manual button or remote control command On by default Controllerswitches on the load output once initialized and keep constant output on condition that the battery is enough...

Страница 17: ...voltage ofsolar module goes below light ON voltage the solar controllerwill recognizethe starting voltage and turn on the load after pre set time delay when the battery poweris enough and the controll...

Страница 18: ...after light control turns ON load Working Time 2 T2 Load working period beforelight control turns OFFload Night Time The controller calculated the total length ofthenight by self learning The time sho...

Страница 19: ...Remark LED Rated Current Rated output current LED Rated Current Percentage Set up theparameterofthe rated current percentageofthe corresponding operating period ofthe controller the controllerwill con...

Страница 20: ...no abnormal situation Manually Off By default Controllerkeep the load output off before during and after initialized The load can be switched on only when doing Manual On by default operation and the...

Страница 21: ...ignal During the period iflight signal voltage continues matching Light ON OFFvoltage it will carry out corresponding actions Thetime adjustment range 0 99mins Light Control Time Model 1 Work Time1 T1...

Страница 22: ...d Work Time2 T2 The running houroftheload after the end ofthe work time 1 Work Time3 T3 Load working period beforelight control turns off load Night Time The controller calculated the total length oft...

Страница 23: ...it the time by clicking Manually SPP time Display real time clock ofSPP 01 The current PC time data can bedirectly updateto SPP 01 by clicking Update button click Manually button to edit thevalues cli...

Страница 24: ...t Power supply Fromthree AAA 7 batteries FromMicro USB cable viaPCUSBpower Fromexclusivedata cableviathe controller Buzzer One built in buzzer to prompt that communication is right orwrong Communicati...

Страница 25: ...23 6 SPP 01 Overall Dimension...

Отзывы: