Stand 31.07.08, PW 30, PW 30 HV, Profile roll
Page 15 of 50
1.10.1 Breaking and assuring the machine
Deactivate the machine before the beginning of attendance and maintenance
work with the main switch. Assure the main switch with a u
– lock and retain the
key. If applicable brew the mains plug.
Mark and assure the machine clearly against unauthorised resetting.
Warning!
Moves of machine parts and electric machine parts can hurt you and
others heavy. Act very careful if it is not necessary to unplug the
machine because of working. Inform personnel around you about your
cycle and the possible dangers.
1.10.2 Use of hoisting devices for attendance work
Warning!
If the lifting tool is not stable enough it can burst what may cause heavy
or deadly injuries.
Check before working with lifting tool whether it is admitted for the load
and undamaged. Assure that the load is fixed correctly. Never step
under lifted loads. Please observe the effective accident prevention
regulations for your business.
1.10.3 Mechanic attendance work at the machine
Before or after attendance work:
Replace all protection and safety units that are especially for attendance
work and activate the machine with the machine
– own protection and
safety units. Check the protection and safety units after every
attendance or maintenance work about completeness and correct
function.
1.11 Accident report
Inform your superior directly about acciden
ts or “nearly accidents”.
So
– called „nearly accidents“ can have different causes and need a detailed
analysis.
1.12 Electricity
You are bound to let the electrical equipment of the machine check regularly.
We advise you at least a checking every 6 months. Deficiencies like damaged
cables or not fixed connections you have to correct always immediately
underneath observance of the safety measures. During work at live parts a
second person always has to be attendant who can switch
– off the machine in
an emergency.
The machine must be out off gear immediately by failure in the electrical supply.
You will find more information in chapter maintenance
Содержание PW 30
Страница 37: ...Stand 31 07 08 PW 30 PW 30 HV Profile roll Page 37 of 50 10 Exploded drawing 10 1 Schematic drawing 1 ...
Страница 38: ...Stand 31 07 08 PW 30 PW 30 HV Profile roll Page 38 of 50 10 2 Schematic draiwng 2 ...
Страница 39: ...Stand 31 07 08 PW 30 PW 30 HV Profile roll Page 39 of 50 10 3 Schematic drawing 3 10 4 Schematic drawing 4 ...
Страница 40: ...Stand 31 07 08 PW 30 PW 30 HV Profile roll Page 40 of 50 10 5 Schematic drawing 5 10 6 Schematic drawing 6 ...
Страница 41: ...Stand 31 07 08 PW 30 PW 30 HV Profile roll Page 41 of 50 10 7 Schematic drawing 7 10 8 Schematic drawing 8 ...
Страница 42: ...Stand 31 07 08 PW 30 PW 30 HV Profile roll Page 42 of 50 10 9 Schematic drawing 9 ...
Страница 43: ...Stand 31 07 08 PW 30 PW 30 HV Profile roll Page 43 of 50 10 10Schematic drawing 10 ...
Страница 45: ...Stand 31 07 08 PW 30 PW 30 HV Profile roll Page 45 of 50 12 Electricity 12 1 Overview electricity ...
Страница 47: ...Stand 31 07 08 PW 30 PW 30 HV Profile roll Page 47 of 50 14 Circuit diagram 14 1 Circuit diagram ...