Safety and operating instructions
32
© Construction Tools PC AB | 3390 5211 01 | 2020-09-18
Original Instructions
7.1 Maintenance schedule
daily
Check the hydraulic lines for leaks
Check that the pipe clamps on the carrier are tight
Tighten the screw connection to the adapter plate
Check the connection to the carrier (bolts, lock pins)
Check the rubber isolators for cracks
during and after the first 50 oper-
ating hours
Tighten the screw connections every day
Replace the oil filter cartridges after the first 50 operating hours.
weekly
Check the screw connections and tighten as required
Check the outer and rotor housings and the adapter plate for cracks
every 500 operating hours
Check the oil filter and replace as required.
if necessary
Cleaning
Replace bent and damaged pipes
Replace damaged hoses
Check the adapter plate bolts for wear
once a year
Change the oil in the PermanentLube system