26
Installation and Operating Instructions - EOS Herkules XL S120
Installation
EN
Removing the side panels
1
Unscrew the 8 screws from the side panels. Each side panel has 4 holes
for one screw in each corner.
The dismantling process is identical on both sides.
2
Remove both side panels.
a)
Remove one side panel while holding onto the wood guard rail.
b)
Remove the wood guard rail.
c)
Remove the second side panel.
Lifting the heater from the pallet
1
CAUTION! The heater weighs a minimum of 85 kg. Four people should
always move the heater.
Lift the heater from the pallet and position it close to the designated in-
stallation site but ensure that you can still access the rear side.
2
Remove the remaining protective film.
The heater is positioned and fully mounted once the electrical lines (and
the water supply line for Herkules XL S120 Vapor) have been connected.
These steps are described in the chapter Connections,