Envision One cDLM® User Manual
TS-MAM-EnvisionOneCDLMUserManual-V5.0-FN-EN , 2021-12-15
Page 24 of 73
•
To update the printer, tap
[Yes]
.
•
To discard the update message, tap
[Cancel]
.
7.1.3
Connecting the Parts Washing Apparatus
The PWA 2000 is the recommended parts washing apparatus for the Envision One cDLM printer. To set up the
PCA 2000, check the corresponding
Technical Guide
provided with your PWA 2000 if ordered.
7.1.4
Connecting the Parts Curing Apparatus
The PCA 2000 is the recommended parts curing apparatus for the Envision One cDLM printer. To set up the PCA
2000, check the corresponding
Technical Guide
provided with your PCA 2000 if ordered.
7.1.5
Setting Up the Oxygen Concentrator
IMPORTANT
Risk of damage to the printer!
Do not add water to the oxygen concentrator, it can damage the printer.
The Oxygen Concentrator is delivered preset to the correct pressure.
Twelve spare filters are shipped with the concentrator. Store these in a safe place.
REFERENCE
More information about the oxygen concentrator you can find in the corresponding
User Manual
.
Step by Step
1. Place the oxygen concentrator on the floor, near the printer.
2. Place the concentrator so that there are at least 12 inches (30 cm) of space between the concentrator and
any walls, curtains, or other obstructions.
3. Plug the power cable into the concentrator.
4. Wait about ten minutes for the automatic priming process.
→ An orange indicator will turn off when the concentrator is ready to be
plugged into the printer.
IMPORTANT
Risk of damage to the printer!
The priming must finish before plugging the oxygen concentrator into the printer.
7.2
Installing Envision One Build Platform
To attach the build platform, proceed as follows:
1. Open the printer’s hood.
2. Loosen the build platform knob on the top of the printer by a couple of turns.
3. Slide the build platform into the build platform housing at the top of the Z-axis
tower.
4. Tighten the build platform torque knob down to secure the build platform in
place.
IMPORTANT
Make sure the build platform is tightened down securely before building. Failure to do so will
cause the build platform to be uneven and can cause build failures.
Figure 12: Build platform installation