background image

ÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿ

EVHP and EVHPH SERIES

TECHNICAL MANUAL

HEAT PUMP TANKS

Содержание EVHP 1000

Страница 1: ...EVHP and EVHPH SERIES TECHNICAL MANUAL HEAT PUMP TANKS...

Страница 2: ...on In this case it is up to the installer along with the client to determine the best and safe way to install the Tank Additional fixing points or equipment may be required Never fill the closed circu...

Страница 3: ...ty of the water entering the Tanks should be within potable standards and in any case be within the values of the table below If the quality of the water does not correspond to these values then speci...

Страница 4: ...tric Element ER Inlet 1600 1675 1755 Ha Sensor S3 Inlet 1600 1675 1755 Ha Solar Coil Inlet CI2 1600 1675 1755 Ha Solar Coil Outlet CO2 1600 1675 1755 C Heat Pump Coil outlet CO1 305 210 245 G Recircul...

Страница 5: ...UMP TANKS 200Lt TO 500Lt WITH OR WITHOUT SOLAR COIL EVHP EVHPS 200 EVHP EVHPS 300 EVHP EVHPS 500 Nominal Volume Lt 200 300 500 Heat Pump Coil Heat Exchanger C1 Capacity Lt 22 7 31 5 36 1 Heat Pump Coi...

Страница 6: ...VHP S 2000 EVHP S 3000 EVHP S 4000 EVHP S 5000 EVHP S 7000 EVHP S 9000 Nominal Volume Lt 750 1000 1500 2000 3000 4000 5000 7000 9000 Actual Volume Lt 757 940 1480 1940 2940 3960 4700 6950 8960 Interna...

Страница 7: ...iameter mm 800 800 1100 1200 1300 1500 1600 1800 2000 E Recirculation R mm 1210 1 1507 1 1532 2 1532 2 2050 2 2050 3 2050 3 2580 3 2580 3 F Middle of Upper Flange and EH2 mm 1187 1198 1180 1180 1490 1...

Страница 8: ...9000 Actual Volume Lt 866 1480 1940 2940 3960 4700 6950 8960 Total Length cm 2150 2150 2150 2700 2700 2700 3280 3400 Total Height cm 1200 1500 1600 1700 1900 2000 2200 2400 Diameter cm 1000 1300 1400...

Страница 9: ...to position the bottom of the metallic Transportation Pallet must always remain in contact with the Floor as per Picture 4 on the Left When in Position the Pallet remains fixed on the Tank as per pict...

Страница 10: ...ve in the middle Then put the bolts back in place screwing the flanges to the Tank as per picture 8 above on the right Pic 6 Pic 7 Place the Insulation of the Top of the Tank and the Top Cover as per...

Страница 11: ...INSTALLING AND REMOVING THE HARD INSULATION SHELL When Installing or Removing the Hard Insulation Shell it is Imperative to follow the order 1 to 7 as per the pictures below The smallest part is place...

Страница 12: ...Pic 4 Pic 6 Pic 7 Pic 5...

Страница 13: ...r quality at the water can result in scale formation and may block the safety valves and Tank outlets leaving the tank unprotected against very high temperatures above 90 C and high pressure greater t...

Страница 14: ...if necessary at least every year depending on the quality of the water The size of the anode varies depending on local norms and requirements For replacing the anode proceed as follows Shut down the...

Страница 15: ...be changed and replaced by a New Joint every time the Tank is opened and the Stainless Steel Coil is unscrewed Attention The Rubber Flange joint must always be changed and replaced by a New Joint eve...

Страница 16: ...r is connected 8 That the temperature set on the mixing valve is not too low below 50 C depending on local regulations 9 If the electric back up is working In case it is not working please check the f...

Страница 17: ...pany personnel and as per Maintenance Recommendations in the product Installation Manual The 1st service must be conducted within 1 year 12 months after the date of purchase of the product at the clie...

Страница 18: ......

Отзывы: