background image

Zhejiang Envertech Corporation Ltd. 

Tel:+86 579 8926 6326
  Email:[email protected]

 

    Add:24th Floor, Jintong Mansion,
      Center of Headquarters, Yongkang City,
         Zhejiang Province, China 

User Operating Manual

Model Number:  EVB300

Zhejiang Envertech Corporation Ltd.

All rights reserved

Содержание EVB300

Страница 1: ...Tel 86 579 8926 6326 Email info envertec com Add 24th Floor Jintong Mansion Center of Headquarters Yongkang City Zhejiang Province China User Operating Manual Model Number EVB300 Zhejiang Envertech C...

Страница 2: ...onnection 3 5 Add MI 4 Main Functions 4 1 Register a New Account 4 2 EnverPortal Monitoring System 4 2 1 Overview Page 4 2 2 Real time Monitoring 4 2 3 Historical Data 4 2 4 Add devices 4 3 EnverView...

Страница 3: ...8 9 10 11 Antenna mounting hole Reset hole Mode light Network light Status light Power connection port 3 phase electrical interface Current sampling interface Ethernet port RS485 port USB port Mount...

Страница 4: ...on port used for communication and control between RS485 equipment and EVB300 172mm 100mm 45 5mm 750 g Natural Convection No Fans 40 65 IP40 CE 3 Years Interface Capacity Number of Devices Connected M...

Страница 5: ...bove enter the Wi Fi name at 1 or click the search button to select the corresponding Wi Fi name e After the above operation click save b Open EnverView and click Wi Fi Setting a Connect network whose...

Страница 6: ...tically Step3 Click confirm to finish Adding MIs A Make sure the LAN cable is connected to the network port on the bottom of the EVB300 B Connect the LAN cable to a spare port on the router 2 Direct L...

Страница 7: ...as that of every module in the system New users need to register an account Registration address www envertecportal com Click Next and create a power station 4 1 Register a New Account Smart Monitorin...

Страница 8: ...and manage its devices 1 Add MI Click Add MI on the upper right of the screen to add your microinverter 4 3 3 Settings 1 After logging in the app you will reach the interface below 2 The real time dat...

Страница 9: ...Operation Steps Step1 Select Safety Param Selection 3 Upgrade Introduction When a new version is released the firmware can be upgrade remotely Operation Steps A Select Upgrade B Click button on the u...

Страница 10: ...y b Manual Control First need to select Manual control to set manual control Then select power factors that you need There are leading power factors 0 99 0 98 0 97 0 96 and 0 95 Lagging power factors...

Страница 11: ...e controlled by the power control of the grid There are two control modes here Manual control can control the power by setting the upper limit of A B C three phase power automatic control can limit th...

Страница 12: ...edge and practical experience to perform these checks The data should be recorded in an equipment log If the device is not functioning properly or fails in any of the tests the device has to be repair...

Страница 13: ...class Overvoltage cate go r y 220 230V 3 27A 50Hz 60Hz 0 95 7 OVC III AC Main OVC II PV Zhejiang Envertech Corporation Ltd www envertec com Model EVT720 PV Microinverter User Identif ic ation Number...

Отзывы: