Installing a K-Series AC Power Supply in the K-POE-4BAY PoE Shelf
3-4 Installing a Power Supply
The front panel should be flush with the face of the K-Series chassis. If significant resistance is
encountered before the front panel is flush, remove and reinsert the power supply. Do not
force the power supply into place.
Figure 3-3 Installing a K-Series AC Power Supply in the K-POE-4BAY PoE Shelf
4.
Secure the power supply to the shelf by screwing the captive screws into the shelf.
5.
If you are installing more than one power supply, remove the coverplates from the applicable
number of power supply
slots, as shown in
.
Keep the coverplates in the event you need to remove the power supplies.
Caution:
Forcing a misaligned power supply into place can damage the power supply and/or the
chassis backplane.
Precaución:
Colocar de manera forzada una fuente de poder o no colocarla bien alineada podría
dañarla y/o maltratar el panel posterior del chasis.
1
Power supply
4
Faceplate
2
Power supply handle
5
Power supply slot
3
Captive screw
Содержание K-POE-4BAY
Страница 1: ...P N 9034570 01 Enterasys K Series K POE 4BAY PoE Shelf Hardware Installation Guide ...
Страница 2: ......
Страница 12: ...x ...
Страница 18: ...Registering Your Product xvi About This Guide ...
Страница 36: ...Connecting a K Series AC Power Supply to AC Power 3 6 Installing a Power Supply ...