background image

ENG

Ensto Wallbox

RAK111_ENG

20.12.2019

© Ensto 2019

Installation Instructions

Operation Instructions

Содержание EVB100

Страница 1: ...ENG Ensto Wallbox RAK111_ENG 20 12 2019 Ensto 2019 Installation Instructions Operation Instructions...

Страница 2: ...oles EVTL43 00 and EVTL48 00 16 6 Electrical Connections 17 6 1 Wiring Instructions 17 6 2 Power Supply 18 7 Commissioning 20 7 1 Connecting to Wallbox 20 8 User Instructions 21 8 1 User Interfaces 21...

Страница 3: ...tation must be installed by a qualified person Read this manual before installation and usage of the charging station This manual must be stored in a safe location and be available for future installa...

Страница 4: ...OT21715 Included in the delivery Note Cable glands are not included in the delivery Please order suitable cable glands separately according to the used supply cable sizes for example Ensto KTM cable g...

Страница 5: ...5 RAK111_ENG Ensto 2019 EVTL40 00 Wall bracket The wall bracket is pre installed to the charging station 300 2x 6 436 240 4x 7 320...

Страница 6: ...6 RAK111_ENG Ensto 2019 EVTL43 00 Ground Floor mounting pole 200 250 150 4 x 1 4 100 1029 5 4 x 9 5...

Страница 7: ...7 RAK111_ENG Ensto 2019 EVTL44 00 Adapter for ground mounting 60 3 100 150 408 1 54 5 8 4 x M12 200 250...

Страница 8: ...8 RAK111_ENG Ensto 2019 EVTL48 00 Wall mounting pole 474 4 x 9 5 145 963 170 279 220 4 x 10...

Страница 9: ...space needed for operating and maintenance Make sure that the mounting foundation is suitable and robust In order to ensure the optimal charging performance the the charging station should not be exp...

Страница 10: ...on the wall type 5 2 Wall Mounting with Wall Bracket Items needed Wall bracket EVTL40 00 1 pcs Screws 4 pcs Installation steps 3 Open the front cover lock and remove the front cover Note RFID LED mod...

Страница 11: ...9 4 Place the Wallbox on the wall bracket 1 5 Attach the top of the Wallbox on the wall bracket using the screws included in the delivery 2 6 Secure the bottom of the Wallbox with the screws included...

Страница 12: ...le drain pipes in place Fill the pit with concrete Let the concrete solidify make sure that the surface stays solid and level during the pro cess Installation steps 1 Make sure that the concrete surfa...

Страница 13: ...ete foundation into the installa tion hole For more information please see the concrete foundation mounting instructions 4 Put cable and possible drain conduits in place 5 Lift the adapter EVTL44 00 i...

Страница 14: ...h the wall mounting pole 4 Attach the Wallbox on the wall mounting pole See instructions on page 16 5 6 Ground Mounting on Unimi Concrete Foundation This installation example describes the installatio...

Страница 15: ...tric cables through the conduits into the foundation approx 1500mm measured from the top of the foundation 7 Tighten the foundation to its place by filling the excess space outside the foundation with...

Страница 16: ...ed to the front cover Be careful not to break any components when you remove the front cover 2 Remove the flange at the bottom of the Wall box frame 3 Open the knock outs and insert the cable glands n...

Страница 17: ...the cable sheath approx 200 mm 4 Secure the front DIN rail in place 5 Pull the supply cable through the plastic guide included in the delivery 6 Run the supply wiring above the DIN rail in such a mann...

Страница 18: ...h charging outlet Stranded cables are recommended in Wallbox installations EVB100 and EVB200 A Residual current protection device RCD and a circuit breaker MCB for each charging outlet must be install...

Страница 19: ...allbox with 1 outlet integrated RCD MCB N PE L2 L3 L1 F01 MCB B6 2 1 2 1 N QF1 MCB RCD 32A 2 1 2 1 N N L PE SUPPLY Example 2 Supply connection from IT network for Wallbox with 2 outlets L2 L3 L2 L3 SU...

Страница 20: ...the Wallbox is going to be connected to some back office online mode first make sure that the basic function ality is working before establishing communication 7 1 Connecting to Wallbox If you want t...

Страница 21: ...hicle for charging The indicator light turns to stable blue Stop Charging with RFID Show the RFID tag to the RFID reading area When you stop the charging event the indicator light turns to waving gree...

Страница 22: ...6 50 mm Design and Mechanics Materials Frame Painted steel frame Cover Plastic Color Frame RAL7021 Anthracite Cover White and black tape Weight approx 10 kg depends on product configuration Enclosure...

Страница 23: ...ominal current 32A RCB MCB EVB101 EVB201 EVB103 integrated type A 30mA class C nominal current 32A Control voltage 12VDC Temperature control High operating temperature such as direct sunlight can caus...

Страница 24: ...no bad contact connection exist wire or PCB Check the tightness of the PE cable screw Power supply cables L1 L2 L3 N and PE are properly connected Insulation of power supply cables is intact L1 L2 L3...

Страница 25: ...en at idle and blue while charging Available electricity at the sockets All the contacts L1 L2 L3 must be tested Use a Mode 3 tester Test the functioning of Mode 3 from green to blue Use a Mode 3 test...

Страница 26: ...r I2C SDA I2C CLK I2C GND S0 Power RS485 A S0 Data RS485 B OPTO 2 OPTO 2 OPTO 1 OPTO 1 MCB1 IN MCB2 IN RCD IN EX SOCKET IN GND GND GND GND EX IN 1 EX IN 2 GND GND XST1201 1 RFID EHZ XKL6001 XKL6000 XK...

Страница 27: ...er RS485 A S0 Data RS485 B OPTO 2 OPTO 2 OPTO 1 OPTO 1 MCB1 IN MCB2 IN RCD IN EX SOCKET IN GND GND GND GND EX IN 1 EX IN 2 GND GND XST1201 1 RFID EHZ XKL6001 XKL6000 XKL6002 4 3 2 1 4 3 2 2 1 1 Curren...

Страница 28: ...1 8 1 XBU10200 8 1 XBU1100 8 1 4 1 XST9000 1 XBU03000 OUT L3 XBU8000 XBU8001 CT EX OUT 2 EX OUT 2 EX OUT 1 EX OUT 1 I2C Power I2C SDA I2C CLK I2C GND S0 Power RS485 A S0 Data RS485 B OPTO 2 OPTO 2 OPT...

Страница 29: ...OPTO 2 OPTO 2 OPTO 1 OPTO 1 MCB1 IN MCB2 IN RCD IN EX SOCKET IN GND GND GND GND EX IN 1 EX IN 2 GND GND RFID EHZ XKL6001 XKL6002 4 3 2 1 2 1 XKL8002 XKL8001 XKL8000 XST8000 1 XST5000 1 XBU1000 12V OU...

Страница 30: ...ned residual current protection device and a circuit breaker and a MID class energy meter Note Cable glands are not included in the delivery Please order suitable cable glands separately according to...

Страница 31: ...tension box EVK 1 pcs Fastening set including mounting lugs and screws Screws not included Installation steps 1 Put the fastening lugs in place on the rear side of the enclosure 2 Secure the lugs with...

Страница 32: ...flange at the bottom of the extension box 5 Open the knock outs and insert the cable glands needed for connection cables 6 Cut the connection cables in suitable lengths Make sure that the supply conn...

Страница 33: ...N EX SOCKET IN GND GND GND GND EX IN 1 EX IN 2 GND GND XST1103 1 XST4003 1 XST4002 1 XST1200 1 XST1102 1 XST1101 1 XST1100 1 EX OUT 2 EX OUT 2 EX OUT 1 EX OUT 1 I2C Power I2C SDA I2C CLK I2C GND S0 Po...

Страница 34: ...torque 4 Nm 2 5 4 mm 12 Nm 6 50 mm RCB MCB Type A 30mA class C nominal current 32A Energy measurement MID class energy meter Design and Mechanics Materials Polycarbonate Color Frame grey RAL7035 Cover...

Страница 35: ...ed with Mode 3 lock release functional ity turn off the power from F0 and pull charging cable out from the socket Option 2 Turn off the power Switch Mode 3 lock manu ally into open position Power is o...

Страница 36: ...e n s t o c o m Ensto Finland Oy Ensio Miettisen katu 2 P O Box 77 FIN 06101 Porvoo Finland Tel 358 20 47 621 Customer service 358 200 29 007 ensto ensto com...

Отзывы: