Charging Point Installation / Commissioning Checklist
7.1
Introduction
This checklist is a guidance for ensuring both mechanical
and electrical installation as well as commissioning of the
Chago Media charging points.
7.2
Before Installation
Read the product specific installation instructions (
Ensto
Commissioning instructions
) before performing any actions.
Note! Only trained electrician may perform the installation
in accordance with the applicable local and national
electrical rules and standards.
7.3
Checking the Installation
Go through the visual, mechanical and electrical installation when the
charging point is un-powered.
CATEGORY
X
ITEM
NOTES
Overall look
Ordered material has been received.
Protective plastic wrapping have been
removed.
No scratches or damages may be
seen.
Mechanical installation
Charging point is fixed properly on the
ground.
The front cover opens and closes
smoothly.
Содержание Chago Media
Страница 1: ...Chago Media Installation instructions Operation instructions...
Страница 4: ...RAK107 22 5 2018 4...
Страница 17: ...RAK107 22 5 2018 17 Picture 7 Door s and TFT LCD element s locks and open close directions...
Страница 20: ...RAK107 22 5 2018 20 Picture 11 Display s inside...
Страница 41: ...RAK107 22 5 2018 41 Diagnostic board 95IPD...
Страница 47: ...RAK107 22 5 2018 47 12 2 TFT LCD panel failure...
Страница 48: ...RAK107 22 5 2018 48 13 Concrete installation drawing...
Страница 49: ...RAK107 22 5 2018 49 14 Charging point wiring diagram...