background image

 

Q U I C K   I N S T A L L   G U I D E 

Installing 

Enphase S-Series 

Microinverters

To install the Enphase S230 and S280 Microinverters™, read and follow all warnings and instructions in this guide and in the 

Enphase S230 and S280 

Microinverter Installation and Operation Manual

 at: 

enphase.com/support

. Safety warnings are listed on the back of this guide.

The Enphase Microinverter models listed in this guide do not require a grounding electrode conductor (GEC) between microinverters because ground fault 

protection (GFP) is integrated into the microinverter. To support GFP, use only PV modules equipped with DC cables labeled 

PV Wire

 or 

PV Cable

.

D )  Check that you have these 

other items

:

• 

Outdoor-rated, weather-proof AC junction box(es)

• 

Gland or strain relief fitting (one per AC junction box)

• 

Number 2 and 3 Phillips screwdrivers

• 

Torque wrench, sockets, wrenches for mounting hardware

• 

Adjustable wrench or open-ended wrench (for terminators)

E )  Protect your system with lightning and/or surge suppression devices. It 

is also important to have insurance that protects against lightning and 

electrical surges. 

F )  Plan your AC branch circuits to meet the following limits for maximum 

number of microinverters per branch when protected with a 20-amp 

maximum over-current protection device (OCPD). 

Service type

Max. S230s per 

branch circuit

Max. S280s per 

branch circuit

Single-phase 240 VAC

17

14

Three-phase 208 VAC

24

21

G )  Size the AC wire gauge to account for voltage rise. Select the correct 

wire size based on the distance from the beginning of the microinverter 

AC branch circuit to the breaker in the load center. Design for a voltage 

rise total of less than 2% for the sections from the microinverter AC 

branch circuit to the breaker in the load center. Refer to the Voltage Rise 

Technical Brief at enphase.com/support for more information. 

 

Best practice:

 Center-feed the branch circuit to minimize voltage rise in 

a fully-populated branch.

PREPARATION

A )  Download the Enphase Installer Toolkit™ mobile app and 

open it to log in to your Enlighten account. With this app, 

you can scan microinverter serial numbers and connect 

to the Envoy-S to track system installation progress. To 

download, go to 

enphase.com/toolkit

 or scan the QR code at right.

B )  Refer to the following table and check PV module electrical compatibility  

calculator at: enphase.com/en-us/support/module-compatibility. 

 NOTE:

 S-Series Microinverters may only be paired with  

 

 60-cell PV modules.

C )  In addition to the Enphase Microinverters, PV modules and racking, you 

will need these 

Enphase items

:

• 

Enphase Envoy-S™ communications gateway (required to monitor 

solar production)

• 

Enphase Engage Cable™, single-phase 240 VAC or three-phase 208 

VAC, as needed

• 

Tie wraps or cable clips

• 

Enphase Sealing Caps (for any unused drops on the Engage Cable)

• 

Enphase Terminators (one needed at the end of each AC branch 

circuit)

• 

Enphase Disconnect Tool (number 2 and 3 Phillips screwdrivers can 

be substituted)

How It Fits Together

© Enphase Energy, Inc. All rights reserved.

Enphase Customer Support:

 enphase.com/en-us/support/contact

AC connector

Enphase

Microinverter

DC connectors

AC

junction box

terminator

Engage

Cable

Tie wraps or

cable clips

AC drop on

Engage Cable

Содержание S280

Страница 1: ... the distance from the beginning of the microinverter AC branch circuit to the breaker in the load center Design for a voltage rise total of less than 2 for the sections from the microinverter AC branch circuit to the breaker in the load center Refer to the Voltage Rise Technical Brief at enphase com support for more information Best practice Center feed the branch circuit to minimize voltage rise...

Страница 2: ...s as required by local jurisdictions 2 WARNINGS Install the microinverter under the PV module to avoid direct exposure to rain UV and other harmful weather events Do not mount the microinverter in a vertical position that allows water to collect in the connector recess as it may have a harmful effect on the long term endurance of the unit Do not expose the AC or DC connectors on the Engage Cable c...

Страница 3: ...nstallation Connecting the Envoy S Detecting the microinverters Connecting to Enlighten Registering the system Building the virtual array Connect the PV Modules A Mount the PV modules above the microinverters B Connect the DC leads of each PV module to the DC input connectors of the corresponding microinverter C Check the status LED The LED flashes six times when DC power is applied 9 status LED F...

Страница 4: ...manner Use the terminator to seal the conductor end of the Engage Cable no other method is allowed NOTE Do not use the shipping cap to cover unused connectors The shipping cap does not provide an adequate environmental seal Enphase sealing caps are required to protect against moisture ingress Safety Symbols DANGER This indicates a hazardous situation which if not avoided will result in death or se...

Страница 5: ...om Use this map to build the virtual array in Enlighten s Array Builder Escanee el mapa completo y cárguelo en Enphase Haga clic en Añadir nuevo sistema en https enlighten enphaseenergy com Utilice este mapa para crear el conjunto de paneles virtual en el Creador de conjuntos de paneles de Enlighten A B C D E F G H J K L M 1 2 3 4 5 6 7 To Sheet A la hoja de ________ To Sheet A la hoja de ________...

Отзывы: