6
Enertech Global
IOM, WD Models
Enertech Global D-I-Y Policy
Enertech Global’s geothermal heat pumps and system
installations may include electrical, refrigerant and/or water
connections. Federal, state and local codes and regulations
apply to various aspects of the installation. Improperly installed
equipment can lead to equipment failure and health/safety
concerns. For these reasons, only qualified technicians should
install a Enertech Global built geothermal system.
Because of the importance of proper installation, Enertech
Global does not sell equipment direct to homeowners.
Internet websites and HVAC outlets may allow for purchases
directly by homeowners and do-it-yourselfers, but Enertech
Global offers no warranty on equipment that is purchased via
the internet or installed by persons without proper training.
Enertech Global has set forth this policy to ensure installations
of Enertech Global geothermal systems are done safely and
properly. The use of well-trained, qualified technicians helps
ensure that your system provides many years of comfort and
savings.
Equipment Installation
Special care should be taken in locating the unit. All units
should be located in an indoor area were the ambient
temperature will remain above 55°F and should be located in
a way that piping and ductwork or other permanently installed
fixtures do not have to be removed for servicing and filter
replacement.
Electrical
All wiring, line and low voltage, should comply with the
manufacturer's recommendations, The National Electrical
Code, and all local codes and ordinances.
Thermostat
Thermostats should be installed approximately 54 inches off
the floor on an inside wall in the return air pattern and where
they are not in direct sunlight at anytime.
Unit Placement
When installing a geothermal heating and cooling unit, there
are several items the installer should consider before placing
the equipment.
1. Service Access. Is there enough space for service access?
A general rule of thumb is at least 2 feet in the front and 2
feet on at least one side.
2. If units are being placed on racking, the unit must be
placed on a solid foundation covering the full base of the
unit. Also, utilize a foam pad between the unit and the
rack.
3. The installer must verify that all applicable wiring, piping,
and accessories are correct and on the job site.
Pre-Installation
Before you fully install the geothermal equipment, it is
recommended you go through this quick checklist before
placing the equipment.
⧠
Fully inspect the unit after unpacking.
⧠
Locate the Unit Start-Up form from this manual and have
it available as the unit installation proceeds.
Section 3: Installation Considerations
Содержание WD240
Страница 18: ...18 Enertech Global IOM WD Models Section 8 Wiring Diagrams WD 240 Series Wiring Diagram...
Страница 19: ...19 IOM WD Models Enertech Global Section 8 Wiring Diagrams WD 360 Series Wiring Diagram...
Страница 31: ...31 IOM WD Models Enertech Global This Page Intentionally Left Blank...