Visit us at www.enersys.com
Installation, Operation
and Maintenance Manual
Страница 1: ...Visit us at www enersys com Installation Operation and Maintenance Manual...
Страница 2: ...cyclic applications EnerSys recommend to install 2 Volt DIN size cells in horizontal orientation In such configuration the instructions below must be complied with Do not use terminal posts to lift o...
Страница 3: ...e Operation of valve regulated batteries at temperatures higher than 20 C will reduce life expectancy Life is reduced by 50 for every 10 C rise in temperature 5 7 Unreliable Grid Operation with high r...
Страница 4: ...6300 Zug Switzerland EnerSys Asia 152 Beach Road Gateway East Building 11 08 Singapore 189721 Tel 65 6416 4800 2018 EnerSys All rights reserved Trademarks and logos are the property of EnerSys and it...