The maximum storage times before a refresh charge is required and 

recommended open circuit voltage audit intervals are:

Handling

PowerSafe

®

 SBS XL blocs and cells are supplied 

in a charged condition and are capable of extremely 

high short circuit currents. Take care to avoid short- 

-circuiting terminals of opposite polarity.

Important

Please read this manual immediately on receipt of the battery before unpacking and installing. Failure to comply with these instructions will render any 

warranties null and void.

Care for your safety

2

Keep flames away

In case of accidental overcharge a flammable gas 

can leak off the safety vent.

Discharge any possible static electricity from  

clothes by touching an earth connected part.

Tools

Use tools with insulated handles.

Do not place or drop metal objects on the battery.

Remove rings, wristwatch and articles of clothing with 

metal parts that may come into contact with the battery 

terminals.

No smoking, 

no naked flames, 

no sparks

Shield 

eyes

Read 

instructions

Electrical 

hazard

Danger

Recycle scrap 

batteries. 

Contains lead.

Electrolyte  

is corrosive

Clean all acid splash in eyes or on 

skin with plenty of clean water.  

Then seek medical help. Acid on 

clothing is to be washed with water.

Warning: Risk of fire, explosion, or burns. Do not 

disassemble, heat above 60°C (140°F), or incinerate. 

Metallic parts under voltage are present on the 

battery, avoid short circuit. Do not place tools or 

items on top of the battery.

Temperature (°C / °F)

Storage Time  (Months)

OCV Audit Intervals (Months)

+10 / +50

48

12

+15 / +59

34

12

+20 / +68

24

12

+25 / +77

17

6

+30 / +86

12

6

+35 / +95

8.5

3

+40 / +104

6

3

1. Receiving

Upon the receipt of the shipment, check the contents for damage and 

against the packing slip. Immediately inform EnerSys of any damaged 

or missing items. EnerSys

®

 is not responsible for shipment damage or 

shortages that the receiver does not report to the carrier.

2. Storage

2.1. Storage Conditions and Time

If a battery cannot be immediately installed it should be stored in a clean, 

cool and dry area. During storage blocs and cells lose capacity through  

self-discharge. High temperatures increase the rate of self-discharge and 

reduce the storage life.
The chart below shows the relationship between open-circuit voltage (OCV) 

and storage time at various temperatures.

Blocs/cells must be given a refresh charge when the OCV approaches 

the equivalent of 2.10 Volts per cell or when the maximum storage time 

is reached, whichever occurs first.

California Proposition 65 Warning

 – Battery posts, terminals, and related accessories contain lead and lead compounds, chemicals known to the State of California 

to cause cancer and reproductive harm. Wash hands after handling.

2.2. Refresh Charge

Charge at a constant voltage equivalent to 2.29 – 2.40Vpc with a minimum 

0.1C

10

 Amps available for a period of 24 hours.

2.3. Commissioning Charge

Before commencing operation, the battery must be given a commissioning 

charge. The batteries should be charged using constant voltage with 

a minimum charge current of 0.1C

10

 Amps with no load connected to 

the battery. Either of the following methods can be used:
•  Charge for 96 hours at the recommended float voltage of 2.29Vpc  

at 20°C / 68°F or

•  Charge for 24 hours at the recommended boost charge voltage of 

2.40Vpc at 20°C / 68°F. The battery will then be switched over to float 

charging, maintaining the battery under floating voltage for 24 hours 

before any discharge test.

3. Battery Location

The battery compartment/room must have adequate ventilation to limit 

hydrogen accumulation. Batteries must be installed in accordance with 

the IEC 62485-2 standard and any other local/national laws and regulations.

4. Installation

PowerSafe SBS XL batteries are designed for stable grid float applications 

(non-cyclic applications). 12V blocs can be installed on their base 

or horizontally on their longest side whilst 2V cells can be mounted 

in any orientation except inverted.
With regards to the installation of 2V cells in horizontal orientation 

specifically, the instructions below must be complied with:
•  Do not use terminal posts to lift or handle cells.
•  Do not install the cells in such a way that the box-lid seal is resting  

on a runner.

•  Always ensure that the arrow on the lid of each unit is pointing 

in vertical orientation.

Each bloc / cell is supplied with terminal/connector fasteners.
The positive terminal is identified by a “+” symbol on each bloc / cell. 

Install the batteries in accordance with the instructions and/or layout 

drawing, taking care to ensure correct terminal location and polarity.
Connect the blocs / cells with the connectors and fasteners provided. 

The fastener torque value is indicated on the product label.
Place the insulating covers in position immediately after tightening 

the fasteners.

Temperature

(°C / °F)

Storage Time

(Months)

OCV Audit Interval 

(Months)

+10 / +50

48

12

+15 / +59

34

12

+20 / +68

24

12

+25 / +77

17

6

+30 / +96

12

6

+35 / +95

8.5

3

+40 / +104

6

3