Page 22
www.enersys.com Publication No. US-FL-IOM-002 January 2007
8.
Repeat Procedures 5 thru 7 until all units are installed on all tier/steps of the rack. See
Figure 7.5.
To lubricate the rack rails for sliding cells into position,
use only EnerSys Pro-Slide or Dow Corning Silicon
Compound #111.
9.
As soon as cells are unpacked and installed on the rack,
remove the shipping vent plugs and immediately install the
flame arrestors.
DO NOT
attempt to charge cells unless
flame arrestors are in place.
Once installed,
DO NOT REMOVE
the flame arrestors.
They are provided with a filling funnel for adding water and
measuring the electrolyte temperature. Do not permit the
lectrolyte level to drop below the bottom of the tube on the
flame arrestor. Allowing too low a level defeats the flame
arrestor function.
10.
Number the cells starting from the positive terminal of
the battery. The cell numbers supplied are backed
with pressure-sensitive adhesive and should be
applied to the rails or the jars. Before applying the
cell numbers, clean surfaces according to Procedure
3 in Section 12.1.1.
FULL RACK OF CELLS
Figure 7.5
Содержание PowerSafe Data Safe
Страница 8: ......