CONDITION OF BATTERIES ON RECEIPT  

 

/ACCEPTANCE CHECKS

All batteries as dispatched are in a fully charged 
condition, the date of the latest charge being marked on 
the outer packaging and on the battery instruction label.

If the battery is received within three months of the latest 
charge, the only acceptance check required immediately 
upon receipt is inspection of the box for damage during 
shipping. The battery 

does not

 have to be unpacked.

If the box is damaged from shipping, unpack the battery 
to inspect for any damage. If damage to the battery is 
found, contact the shipper immediately.

If the battery is received 4 months or longer after the 
latest charge, unpack the battery to perform a voltage 
check in accordance with paragraph 9.

The battery labels show: -
•  Type of battery (i.e. Lead acid - aerobatic)
•  Manufacturer’s name
•  Manufacturer’s type or product number
•  Manufacturer’s serial number
•  Date of manufacturer’s last charge
•  Modification state
•  Positive terminal polarity
•  Nominal battery voltage and number of cells
•  Rated capacity
•  Safety instructions - where applicable

 

Warning!

 

Short circuit currents will exceed 2000 amps; all tools must be insulated. Care must be taken with all items

 

of metal in clothing and jewellery, e.g. buckles, zips, rings, watches, chains etc.

 

Caution!

 

Always ensure that the battery lid is securely fitted prior to charging.

 

Monobloc terminal nuts are NOT to be re-tightened.

8.

  COMMISSIONING PROCEDURES &    

 

INITIAL TESTING AFTER STORAGE  

 

 

(Refer to Battery Commissioning Flowchart Appendix B)

Note!

1.    

A dedicated lead acid battery room is not required for servicing. A normal electrical workshop may 

be used and under certain conditions the battery can be serviced in a nickel cadmium battery room 
providing an appropriate risk assessment is performed.

2.     Use a calibrated digitial voltmeter with a DCV accuracy of 0.3%, to carry out Open Circuit voltage (OCV) 

checks.

3.  All discharges must be in accordance with the rates detailed in Figure 5. Discharges should be 
   discontinued as soon as a duration of 48 minutes or an end point of 20V is achieved (see section 12). 
    This prevents excessive working of the battery and prolongs its life.

Содержание HAWKER 9250-0083

Страница 1: ...AEROSPACE Sealed Lead Acid Batteries Aircraft Battery Maintenance Manual UK Sealed Lead Acid Batteries Aircraft Battery Maintenance Manual UK...

Страница 2: ...TANT Please read this manual immediately on receipt of the battery ies before unpacking and installing Failure to comply with these instructions will render any warranties null and void to the extent...

Страница 3: ...SPECTION 9 8 2 VOLTAGE CHECKS 9 9 CHARGING PROCEDURE 10 10 ROUTINE MAINTENANCE 10 11 SERVICE PERIOD 11 12 CAPACITY TEST 11 13 REJECTION PROCEDURE 12 14 DEEP DISCHARGE RECOVERY 12 15 UNSCHEDULED REMOVA...

Страница 4: ...id distilled water or alkali to the battery The Hawker 24 volt aircraft battery covered by this maintenance manual consist of two 12 volt valve regulated monoblocs connected in series enclosed in a po...

Страница 5: ...ately Clothing contaminated by acid should be washed in water Electrolyte is highly corrosive In the normal operation of this battery contact with acid isn t possible If the cell containers are damage...

Страница 6: ...ampere discharge for 1 hour down to a battery voltage of 20 volts By conventional definition the battery is deemed airworthy if it delivers its rated capacity for 48 minutes down to a voltage of 20 vo...

Страница 7: ...administered in accordance with paragraph 9 However it is advisable to conduct an inspection and open circuit voltage check after 12 months and top up charge in accordance with paragraph 9 if necessar...

Страница 8: ...rity Nominal battery voltage and number of cells Rated capacity Safety instructions where applicable Warning Short circuit currents will exceed 2000 amps all tools must be insulated Care must be taken...

Страница 9: ...ttery can be issued for service 8 2 4 If the OCV is equal to or less than 25 3 volts but greater than 20 0 volts the battery needs to be charged 8 2 4 1 Charge the battery in accordance with paragraph...

Страница 10: ...he exterior of the battery casing for signs of damage and cracks Examine the battery terminal for signs of damage corrosion and water dirt ingress clean as necessary Always ensure that the battery lid...

Страница 11: ...one hour rate and measuring the time required in minutes to reach the cut off voltage Discharge the battery at the appropriate constant current value found in Figure 5 at 20 2 C to an end voltage of 2...

Страница 12: ...y in accordance with paragraph 9 and notify EnerSys or your distributor of failure If the battery has an OCV of less than 20 volts it is considered to have been abused Over discharging the battery to...

Страница 13: ...lass 8 Proper Shipping Name BATTERIES WET NON SPILLABLE electric storage Packing Group ADR not assigned Label required Corrosive ADR RID New and spent batteries are exempt from all ADR RID special pro...

Страница 14: ...ashers and metal strip laminations from the rear monobloc terminals e Remove and discard the nuts and washers from the front terminals and lift off the laminations Note Do not remove the front laminat...

Страница 15: ...ne maintenance or unscheduled maintenance vii Date of battery returned to storage viii Date of any failures ix Date of any returns to manufacturer x OCV prior to any discharge Dispose of the battery i...

Страница 16: ...V Elcon None 38 0 9750E0640 9750E0654 25Ah 24V Elcon None 27 0 9750E0645 25Ah 24V Elcon 1 27 0 9750E0647 9750E0652 25Ah 24V Elcon 1 27 0 9750E0650 25Ah 24V Spade None 27 0 9750E0658 25Ah 24V Canon 1 2...

Страница 17: ...e as per paragraph 13 0 Issue Battery Reject battery Charge battery as per paragraph 9 0 Charge battery as per paragraph 9 0 Charge battery as per paragraph 9 0 25 5 Volts 25 3 25 5 Volts 25 3 Volts 2...

Страница 18: ...attery as per paragraph 9 0 48 minutes Second time 48 minutes First time 48 minutes Capacity test as per paragraph 12 0 Stand for 4 hours Follow Rejection procedure as per paragraph 13 0 Reject batter...

Страница 19: ...19 Intentionally Left Blank...

Страница 20: ...n support your requirements through our vast network of approved maintenance distributors EnerSys EMEA EnerSys EMEA EH Europe GmbH EH Europe GmbH L wenstrasse 32 L wenstrasse 32 8001 Z rich 8001 Z ric...

Отзывы: