ENERCON Ejector Скачать руководство пользователя страница 1

 
 
 
 
 
 

JECTOR 

CONTAINER EJECT SYSTEM 

ML0068-001-02 

 

OWNERS REFERENCE MANUAL 

 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 

Enercon Industries Corp. 

W140 N9572 Fountain Blvd. 

P.O. Box  (53052-0773) 

Menomonee Falls, WI 53051 

Phone:  (262) 255-6070 

Fax:  (262) 255-7784 

E-mail:  [email protected] 

Web Site:  www.enerconind.com 

 

 

 

 

01/07/2003

Содержание Ejector

Страница 1: ...L0068 001 02 OWNERS REFERENCE MANUAL Enercon Industries Corp W140 N9572 Fountain Blvd P O Box 53052 0773 Menomonee Falls WI 53051 Phone 262 255 6070 Fax 262 255 7784 E mail info enerconind com Web Sit...

Страница 2: ...EJECT SYSTEM INSTALLATION WITH FOIL LINER DETECTOR Figure 1 4 EJECT SYSTEM INTALLATION WITH CAP INSPECTION SYSTEM Figure 2 4 SECTION 3 PRINCIPLES OF OPERATION 5 METHOD OF OPERATION 5 SECTION 4 EJECT S...

Страница 3: ...uctions contained in this manual Before installing wiring starting operating or making any adjustments identify the components of the Eject System using this manual as a guide The operator should use...

Страница 4: ...from when the bad container is detected to when the container reaches the eject zone b Eject time Used to set the time for how long the eject plunger is activated c Cylinder speed adjust Used to set...

Страница 5: ...it should be mounted between the high cap sensor and the power supply See Figure 2 The eject system must be mounted no further than 9 99 seconds down stream due to the maximum range of the delay time...

Страница 6: ...ML0068 001 02 Container Eject System ENERCON INDUSTRIES 4 EJECT SYSTEM INSTALLATION WITH FOIL LINER DETECTOR Figure 1 EJECT SYSTEM INTALLATION WITH CAP INSPECTION SYSTEM Figure 2...

Страница 7: ...plunger activates after the container reaches the plunger decrease the delay time by using the down arrow and repeat the test Continue this process until the plunger makes contact with the center of t...

Страница 8: ...ANING As long as clean air is supplied to the ejector minimal cleaning is required for proper operation ADJUSTING If the line speed or product type does not change there should be no reason to make an...

Страница 9: ...ressure 3 Remove power and open the box and inspect the hose connections looking for an open hose or a kink in a hose 4 Check solenoid wiring 5 Possible bad solenoid 6 Contact Enercon service departme...

Страница 10: ...der on the following pages HOW TO USE THIS PARTS LIST 1 Turn to the Parts Section to locate the desired illustrations 2 Locate the part on the illustration by visual identification and the Index Numbe...

Страница 11: ...t 1 2 PN0092 Regulator Panel Mount 1 3 PN0091 Flow Control Panel Mount 2 4 HW0101 Bumper 1 5 CN0059 Power Entry Module 1 6 LM4439 01 Eject Display Board 1 7A LM4440 01 Eject Control Board 120 VAC 1 7B...

Страница 12: ...Container Eject System ENERCON INDUSTRIES 10 SECTION 7 MISCELLANEOUS EJECT SYSTEM PRODUCTION SET UP Product Delay Time Eject Time Plunger Speed Air Pressure Line Speed High Cap Ejects Y N Missing Foi...

Страница 13: ...___________________________________________________ ________________________________________________________________________________ ___________________________________________________________________...

Отзывы: