Fig. 16: Connection with solid conductors – wire.
4. Use a PZ2 end screwdriver to tighten the termi-
nals with 1.5Nm 1,5 N m torque.
Fig. 17: Electrical connection executed correctly.
5.1.2.
Power connection in version with MID meter
INFO
For both charging sockets to function, in Ene-
lion Wallbox Adspace the voltage must be sup-
plied to the electrical connection clamps of both
charge controllers. The steps described below
should be applied to the terminals of both charg-
ing sockets.
1. Run the left socket power supply cable along the
bottom part of the device below the backlight
shield.
2. Prepare the power cord.
Remove 200 mm of the main insulation off the
power supply cable.
Terminate the individual
wires of the cable with sleeve terminals.
3. Insert the power cables into the terminals of the
MID meter and tighten them.
Unless otherwise marked on the label of the de-
vice, make a standard connection in accordance
with the markings on the meter. The PE protec-
tive conductor should be connected to the pre-
pared coupling.
Fig. 18: Recommended connection when apply-
ing a MID meter.
MID meter communication connection should be done
according to the diagram below:
Fig. 19: MID meter communication connection.
HINT
The colors of the phase wires in Enelion Wall-
box Adspace may not match the colors of the
power cables, maintaining, however, the guide-
lines on Enelion Wallbox Adspace label. This is
a correct and expected situation when using the
phase sequence function.
5.1.3.
RCM B Connection
Enelion RCM B – Residual Current Monitor type B ac-
cessory. Enelion RCM B in combination with the RCD
A used in the switchgear meet all safety requirements.
1. Connect the device to the dedicated socket on
the PilotBox board. [Fig. 20]
13
Connection
Содержание Wallbox Adspace
Страница 1: ...Wallbox Adspace Assembly manual Enelion Sp z o o info enelion com ...
Страница 21: ......
Страница 22: ... 2021 ENELION Pana Tadeusza 50 80 123 Gdan sk Polska ...