Enelion Energy Guard Скачать руководство пользователя страница 7

Energy Guard - Assembly manual

9 - 2021

3.

Design indications of the installation

3.1.

Recommended power connection

Enelion Energy Guard is adapted to be powered from
five or three-wire (with avoiding the PE conductor), in
the TN-S and TT type of networks.

­

HINT

Energy Guard can work in 3 or 1 phase con-
figuration. This Assembly manual is based on
3-phase version. All connection should be done
taking into account the number of phases.

Devices for communication with charging terminals are
supported by the Enelion Chain communication inter-
face. For implementation of it, a wired connection be-
tween devices using a CAT 5 or CAT 6 Ethernet cable
is required.

3.2.

Location selection criteria

This device is designed to be installed inside of the
electrical switchboard, near of the powering cords, on
which should be attached the measuring coils.

o

WARNING

It is forbidden to install the device in easily ac-
cessible locations.

Ÿ

INFO

It is possible to choose the place of installa-
tion of measuring coils. They can be installed
on lines feeding the building load [Fig.4] or to-
gether with the charging stations lines feeding
the building load only [Fig.5].

Fig. 4: Measurement of the entire connection with the
charging terminals.

Fig. 5: Measurement of the load excluding charging ter-
minals.

6

Design indications of the installation

Содержание Energy Guard

Страница 1: ...Energy Guard Assembly manual Enelion Sp z o o info enelion com...

Страница 2: ...Copyright Enelion Sp z o o The manual may change as the product develops The information provided may not be correct All rights reserved Revision V 1 1 Number of pages 16 Released September 24 2021...

Страница 3: ...Recommended power connection 6 3 2 Location selection criteria 6 4 Assembly 8 4 1 Mounting the device 8 4 2 Modification of the electrical switchboard 9 4 3 Controll after commissioning 9 4 4 FAQ 10 5...

Страница 4: ...ore installation please make sure that the module packages contain all the elements Up to date version of the operation manual can be accessed at http enelion com help Please note the contents of the...

Страница 5: ...dur ing its operation must comply with the legal standards in force in the place of assembly and the operation of the device The manufacturer is not liable for any dam age caused by an electrical inst...

Страница 6: ...ad balancing This allows for more effective use of the connection s power for charging vehicles INFO See User manual to learn more The manual contains detailed information on the functional ity and us...

Страница 7: ...n of it a wired connection be tween devices using a CAT 5 or CAT 6 Ethernet cable is required 3 2 Location selection criteria This device is designed to be installed inside of the electrical switchboa...

Страница 8: ...ar heat sources nor in the loca tions exposed to high humidity It is forbidden to install the device in explosion hazard zone Before installation make sure that the mounting space inside the switchboa...

Страница 9: ...of 500 m INFO Pay attention to communication bus termi antion both in Energy Guard and charg ing station Use termination for devices at the beginning and end of the network Termination is done by mov...

Страница 10: ...er source in the case that this branch would be disconnected for example by triggering its protection Fig 8 Sample connection of the voltage lines to the selected apparatus in the switchboard 4 2 Modi...

Страница 11: ...ources are connected to the electri cal system The measuring coils were installed frontside back The status LED flashes yel low Check the connection of the CAN bus wires The status LED is red Contact...

Страница 12: ...y consumption to the charging station thanks to which there is a proportional reduction of the available power for EV charging there is no risk of overloading the home electrical installation and thus...

Страница 13: ...current below 6 A per phase 1 4 kW single phase or 4 1 kW three phase charging If there is not enough power the charger goes into standby mode Charging will resume when minimum charging power is avail...

Страница 14: ...onal current measurement Yes Measurement point parameters Three or one phase system included correct amount of measuring coils Typical reaction time from switch on to change the charging power 1 5 s M...

Страница 15: ...the charging station 3 s of delay Mechanical data Housing Plastic PC ABS mountage on DIN rail IP protection Mountage inside the switchboard Maximum diameter of cables Depends on the measuring coils He...

Страница 16: ......

Страница 17: ...2021 ENELION Pana Tadeusza 50 80 123 Gdan sk Polska...

Отзывы: