Enelion Energy Guard Скачать руководство пользователя страница 5

Energy Guard - Assembly manual

9 - 2021

1.

Important information

1.1.

General provisions

Installation and servicing of the device must be per-
formed by qualified and authorized persons, and re-
pairs may only be carried out by the manufacturer or
entities authorized by the manufacturer.

Tampering with the mechanical, electrical and elec-
tronic components and the device software is forbid-
den and shall result in the nullification of the warranty.
The exceptions include operations described herein
and those agreed in writing with the manufacturer.

The manufacturer is not responsible for damage to
property resulting from the forbidden interference in the
product.

The electrical installation to be used by the device dur-
ing its operation must meet the conditions described
in the installation manual. The manufacturer is not re-
sponsible for incorrect assembly and/or protection of
the electrical installation to which the device is con-
nected.

The manufacturer is not responsible for the malfunction
of the electrical installation to which the device is con-
nected.

The electrical installation to be used by the device dur-
ing its operation must comply with the legal standards
in force in the place of assembly and the operation of
the device. The manufacturer is not liable for any dam-
age caused by an electrical installation that does not
meet legal standards.

The device does not have a built-in switch. The de-
vice activates when the supply voltage is applied. The
power supply cut off function must be provided by the
appropriate electrical installation devices described in
the assembly manual. Except in emergencies, the de-
vice must not be turned off during the charging process.

It is forbidden to supply the power to the device when
the device casing remains open.

The manufacturer is not responsible for loss of health
or life by any persons resulting from failure to comply
with the above-mentioned recommendations.

The AC charger station to which the Energy Guard will
be connected, must be updated to the latest software
version and DLB function activation it is required, which
is described in this manual.

1.2.

Safety instructions

All operations described in this manual should be per-
formed only after making sure that there is no voltage
in the power cord.

Outdoor installation should not be carried out during
precipitation or strong wind, if there is a risk of water
or dirt getting into the device.

4

Important information

Содержание Energy Guard

Страница 1: ...Energy Guard Assembly manual Enelion Sp z o o info enelion com...

Страница 2: ...Copyright Enelion Sp z o o The manual may change as the product develops The information provided may not be correct All rights reserved Revision V 1 1 Number of pages 16 Released September 24 2021...

Страница 3: ...Recommended power connection 6 3 2 Location selection criteria 6 4 Assembly 8 4 1 Mounting the device 8 4 2 Modification of the electrical switchboard 9 4 3 Controll after commissioning 9 4 4 FAQ 10 5...

Страница 4: ...ore installation please make sure that the module packages contain all the elements Up to date version of the operation manual can be accessed at http enelion com help Please note the contents of the...

Страница 5: ...dur ing its operation must comply with the legal standards in force in the place of assembly and the operation of the device The manufacturer is not liable for any dam age caused by an electrical inst...

Страница 6: ...ad balancing This allows for more effective use of the connection s power for charging vehicles INFO See User manual to learn more The manual contains detailed information on the functional ity and us...

Страница 7: ...n of it a wired connection be tween devices using a CAT 5 or CAT 6 Ethernet cable is required 3 2 Location selection criteria This device is designed to be installed inside of the electrical switchboa...

Страница 8: ...ar heat sources nor in the loca tions exposed to high humidity It is forbidden to install the device in explosion hazard zone Before installation make sure that the mounting space inside the switchboa...

Страница 9: ...of 500 m INFO Pay attention to communication bus termi antion both in Energy Guard and charg ing station Use termination for devices at the beginning and end of the network Termination is done by mov...

Страница 10: ...er source in the case that this branch would be disconnected for example by triggering its protection Fig 8 Sample connection of the voltage lines to the selected apparatus in the switchboard 4 2 Modi...

Страница 11: ...ources are connected to the electri cal system The measuring coils were installed frontside back The status LED flashes yel low Check the connection of the CAN bus wires The status LED is red Contact...

Страница 12: ...y consumption to the charging station thanks to which there is a proportional reduction of the available power for EV charging there is no risk of overloading the home electrical installation and thus...

Страница 13: ...current below 6 A per phase 1 4 kW single phase or 4 1 kW three phase charging If there is not enough power the charger goes into standby mode Charging will resume when minimum charging power is avail...

Страница 14: ...onal current measurement Yes Measurement point parameters Three or one phase system included correct amount of measuring coils Typical reaction time from switch on to change the charging power 1 5 s M...

Страница 15: ...the charging station 3 s of delay Mechanical data Housing Plastic PC ABS mountage on DIN rail IP protection Mountage inside the switchboard Maximum diameter of cables Depends on the measuring coils He...

Страница 16: ......

Страница 17: ...2021 ENELION Pana Tadeusza 50 80 123 Gdan sk Polska...

Отзывы: