ESE 807 / 1107 / 1307 / 1407 DBG (ES) DIN
Status at:
February 2013
6
Maintain generator ESE 807 - 1407 DBG (ES) DIN
Generator maintenance is described in this section.
Only personnel from the manufacturer may carry out mainte-
nance or repair work not described in this section.
Maintenance plan
6.1
The maintenance work specified in this summary must be
carried out after the indicated time intervals.
Maintenance work
Time interval in operating hours [h]
after 8 h every 8
h /
daily
every 25
h /
annual-
ly
every 50
h /
annual-
ly
every
100 h /
annual-
ly
annual-
ly
Checking the electrical safety
before each start-up
Checking the oil
X
Changing the oil
(X)
1)
X
Change oil filter
X
Cleaning the air filter
X
2)
Clean area around mufflers,
linkages, and springs
X
Exchange spark plugs
X
Change the fuel filter
X
Check fit of screws, nuts, and
bolts
X
Check condition and tightness
of the fuel hoses and connec-
tions.
X
Table 6.1: Generator maintenance plan
1) First time
2) Clean more frequently when used in a dusty environment
or in the presence of foreign particles in the air or for longer
use in high, dry grass.
Maintenance work
6.2
Only authorised personnel are allowed to carry out mainte-
nance tasks.
Содержание ESE 1107 DBG DIN
Страница 10: ...General information 10 ESE 807 1107 1307 1407 DBG ES DIN Status at February 2013 Notes ...
Страница 25: ...Status at February 2013 ESE 807 1107 1307 1407 DBG ES DIN 25 Notes ...
Страница 32: ...32 ESE 807 1107 1307 1407 DBG ES DIN Status at February 2013 Notes ...
Страница 47: ...Status at February 2013 ESE 807 1107 1307 1407 DBG ES DIN 47 Notes ...
Страница 72: ...72 ESE 807 1107 1307 1407 DBG ES DIN Status at February 2013 Notes ...
Страница 77: ...Status at February 2013 ESE 807 1107 1307 1407 DBG ES DIN 77 Notes ...