Commissioning
Turbimax CUE21 / CUE22
18
Hauser
7
Commissioning
7.1
Function check
‣
Verify that all connections are correct.
‣
In particular, verify that all tubes are firmly attached and are not leaking.
‣
Ensure that the supply voltage is within the permitted range of 100 to 240 V AC!
7.2
Switching on the measuring device
Familiarize yourself with the operation of the device prior to switching it on. To do so, read
the "Basic safety instructions" and "Operation" sections in particular.
1. Switch on the power supply to the device.
2. Wait until the device has warmed up (typically 45 to 60 minutes when
commissioning the device for the first time).
When a continuous process stream is flowing through the device, the device will
output the turbidity level measured in the sample to the LC display. In addition,
the equivalent signal is output on the analog (4-20 mA) or digital output,
depending on the options selected.
3. Configure the device according to your needs.
工程师电话(微信)15915717832
Содержание Turbimax CUE21
Страница 39: ...15915717832...
Страница 40: ...15915717832...