Installation
Turbimax CUE21 / CUE22
12
Hauser
4.3
Post-installation check
1. After mounting, check all the connections to ensure they are secure and leak-tight.
2. Check all cables and hoses for damage.
3. Check whether the cables are routed such that they are free from electromagnetic
interference influences.
工程师电话(微信)15915717832
Содержание Turbimax CUE21
Страница 39: ...15915717832...
Страница 40: ...15915717832...