J22 TDLAS Gas Analyzer
Operating Instructions
Hauser
25
Step 5 is not used for CSA-certified products. Under CEC and NEC requirements, conduit is used in place of
cable glands.
A0033984
Fig 22. Connecting the cables and tightening glands
6.
Close the terminal cover.
7.
Fit the display module holder in the electronics compartment.
8.
Screw on the connection compartment cover.
9.
Secure the securing clamp of the connection compartment cover.
4.6.3
Connecting Modbus TCP
In addition to connecting the device through Modbus TCP and the available inputs/outputs,
Opening the terminal cover
1.
Loosen the securing clamp of the connection compartment cover.
2.
Unscrew the connection compartment cover.
3.
Squeeze the tabs of the display module holder together.
4.
Remove the display module holder.
A0029813
Fig 23. Removing the display module holder
5.
Attach the holder to the edge of the electronics compartment.
6.
Open the terminal cover.
A0029814
Fig 24. Opening the terminal cover
Connecting the cables
1.
Push the cable through the cable entry. To ensure tight sealing, do not remove the sealing ring from the cable
entry.
2.
Strip the cable and cable ends and connect to the RJ45 connector.
3.
Connect the protective ground.