Commissioning
Overfill Prevention System SOP300
28
Hauser
In the case of a redundant power supply
1. Switch on the first circuit breaker. See wiring diagram "+PS1-11F1".
2. Switch on the second circuit breaker. See wiring diagram "+PS1-12F1".
8.3
Configuring the Overfill Prevention System
1. Log an operator onto the system. The operator must at least have the "Operator" access
level.
2. Acknowledge all the alarms and warnings via the
Acknowledge
built-in door button.
3. Reset the safety relays via the
Reset
built-in door button.
4. Assign a password for all users .
5. Set the correct local time .
6. Set the desired proof-test interval.
7. Perform an automated proof-test.
8. Perform a signaling proof-test.
For detailed information on the individual steps, see Operating Instructions BA01787S.
8.4
Configuring sensors
‣
Configure the sensors as described in the relevant sensor documentation.
8.5
Performing the functional test
‣
Perform suitable tests to guarantee the safety function.
Содержание SOP300
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ...www addresses endress com...