Proline Prosonic Flow 90
6 Commissioning
Hauser
63
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• “Installation check” checklist
→
• “Connection check” checklist
→
Switching on the measuring device
Once the connection checks (see Page 41) have been successfully completed, it is time to switch on
the power supply. The device is now operational.
The measuring device performs a number of self-tests after power-on. As this procedure progresses
the following sequence of messages appears on the local display:
Standard measuring mode commences as soon as power-on is completed. Various measured value
and/or status variables appear on the display (HOME position).
!
Note!
If start-up fails, an error message indicating the cause is displayed.
PROSONIC FLOW 90
START UP. . .
Start-up message
▼
SW AMPLIFIER
V X.XX.XX
Current software is displayed (example)
▼
SYSTEM OK
→
OPERATION
Beginning of standard measuring mode
▼
Содержание Prosonic Flow 90
Страница 4: ...Brief operating instructions Proline Prosonic Flow 90 4 Endress Hauser...
Страница 42: ...4 Wiring Proline Prosonic Flow 90 42 Endress Hauser...
Страница 62: ...5 Operation Proline Prosonic Flow 90 62 Endress Hauser...
Страница 74: ...7 Maintenance Proline Prosonic Flow 90 74 Endress Hauser...
Страница 78: ...8 Accessories Proline Prosonic Flow 90 78 Endress Hauser...
Страница 94: ...9 Trouble shooting Proline Prosonic Flow 90 94 Endress Hauser...
Страница 108: ...10 Technical data Proline Prosonic Flow 90 108 Endress Hauser...
Страница 112: ...Index Proline Prosonic Flow 90 112 Endress Hauser...
Страница 114: ...www endress com worldwide BA068D 06 en 11 04 50099981 FM SGLM6 0...