Commissioning
Promag 50
70
Hauser
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist for "Post-installation check"
• Checklist for "Post-connection check"
6.2
Switching on the measuring device
Once the connection checks have been successfully completed, it is time to switch on the power
supply. The device is now operational. The measuring device performs a number of post switch-on
self-tests. As this procedure progresses the following sequence of messages appears on the local
display:
Normal measuring mode commences as soon as start-up completes.
Various measured-value and/or status variables (HOME position) appear on the display.
!
Note!
If start-up fails, an error message indicating the cause is displayed.
PROMAG 50
STARTUP. . .
Start-up message
Æ
DEVICE SOFTWARE
V XX.XX.XX
Current software version
Æ
SYSTEM OK
OPERATION
Beginning of normal measuring mode
Æ
Содержание Proline Promag 50
Страница 2: ......
Страница 120: ...Promag 50 Index 120 Endress Hauser ...
Страница 122: ...www endress com worldwide BA00046D 06 EN 14 11 71136623 FM SGML6 0 ProMoDo ...