Inlet and outlet runs
If possible, install the sensor well clear of fittings such as valves, T-pieces, elbows, etc. Compliance
with the following requirements for the inlet and outlet runs is necessary in order to ensure
measuring accuracy:
• Inlet run:
5 × DN
• Outlet run:
2 × DN
A0003210
Fig. 13:
Inlet and outlet runs
3.2.4
Vibrations
Secure the piping and the sensor if vibration is severe.
"
Caution!
It is advisable to install sensor and transmitter separately if vibration is excessively severe.
Information on resistance to vibration and shock
A0003208
Fig. 14:
Measures to prevent device vibrations (L > 10 m (32.8 ft))
5 x DN
2 x DN
L