CPM280
Commissioning
Hauser
21
11.2 Sensor connection
12
Commissioning
12.1 Function check
Before initial commissioning, make sure that:
• the sensor is correctly connected
• the batteries are sufficiently charged
a0008105
Fig. 7: Connection
1
pH sensor connection
2
Temperature sensor connection
3
Reference electrode connection
Ref
1
2
3