CE 4
Mechanical installation
Hauser
9
3.2.2
Dimensions
The dimensions for the measurement station can be found in chapter "Technical data".
3.2.3
Installation point/foundation plan
Fig. 4:
Foundation drawing without water sampler
Pos. A: M8x20 rawl bolts or M8 rawl plugs
Pos. B: In and outflow hoses for the measurement liquid
Pos. C: Water supply
Pos. D: Power cables
Pos. E: Signal cables
Pos. H: Feed pump installation area
Pos. I: Cabinet base
Pos. K: Overflow shaft
Fig. 5:
Foundation drawing with water sampler
Pos. A: M8x20 rawl bolts or M8 rawl plugs
Pos. B: In and outflow hoses for the measurement liquid
Pos. C: Water supply
Pos. D: Power cables
Pos. E: Signal cables
Pos. F: Water sampler suction hose
Pos. G: Water sampler overflow and condensation water
Pos. H: Feed pump installation area
Pos. I: Cabinet base
Pos. K: Overflow shaft
100
A
A
A
H
I
K
100
84
209
459
568
534
559
240
360
520
620
700
668
0
0
0
184
ø 100
ø5
0
ø5
0
ø5
0
B
B
A
B
C
D
E
100
350
700
450
800
0
100
668
100
1634
207
567
100
100
134
109
534
500
559
257
377
577
677
930
1234
0
0
0
0
568
0
1534
0
ø
100
ø
50
ø
50
ø
50
ø
80
ø
80
100
250
600
B
B
A
A
A
A
B
C
D
E
F
G
H
I
K