Installation
ASP station 2000 peristaltic
76
Hauser
3.3.3
Foundation plan
Fig. 4:
Foundation plan (all data in mm)
A: Fixing points (4 x M10)
B: Cable pit
C: Outflow for condensation water
D: Bottom hose entry (optional)
E: Outflow for overflow
3.3.4
Hydraulic connection
• Maximum suction height: standard 6 m; optional: 8 m
• Maximum hose length: 30 m
• Hose connection diameter: 10 mm internal diameter
• Suction velocity:>0.5 m/s, acc. to EN 25667
"
Caution!
• Always lay the sampling hose in such a way that it rises from the sampling point to the sampler.
• The sampler must be above the sampling point.
• Avoid siphon formation in the sampling hose.
Sampling point
Requirements of the sampling point:
"
Caution!
• Do not connect the sampling hose to pressurised systems.
• Use the suction filter to impede coarse and abrasive solids and solids which can cause clogging.
• Immerse the suction hose in the direction of flow.
• Take the samples at a representative point (turbulent flow; not directly at the bottom of the
channel).
• The medium must be conveyed free of bubbles in the suction hose
Water connections
1.
Mount the device according to the mounting conditions
2.
Lay the sampling hose from the sampling point to the device.
!
Note!
Please observe the requirements of a sampling point, as specified in
3.
Screw the sampling hose to the hose connection of the device
Fig. 2, item d.
Содержание ASP Station 2000 peristaltic
Страница 66: ...ASP Station 2000 Peristaltik Index 66 Endress Hauser W Warenannahme 8 Werkstoffe 63 ...
Страница 197: ...ASP Station 2000 péristaltique Index Endress Hauser 197 ...
Страница 198: ...Endress Hauser ...
Страница 199: ...Endress Hauser ...
Страница 200: ...www endress com worldwide BA176R 09 a3 04 06 51008239 FM SGML6 0 ProMoDo ...