multi X 2500
Operation
49
5
Operation
5.1
Switching on the analyzer
Before switching on check the following:
The gases (oxygen, argon) are connected with a primary pressure of 4 to 6 bar.
A combustion tube has been inserted in the furnace.
The gas supply hoses are connected.
The chlorine module is connected.
The autosampler (optional) is installed.
1.
The analyzer and the chlorine module are switched on.
The devices are booted. The status LEDs on the front panels light up in green
after approximately 30 seconds.
2.
Switch on the PC.
3.
Start the multiWin control and analysis software. Log in with user name and
password.
4.
Initialize the analysis system by clicking on [
INITIALIZE ANALYZER
].
The initialization and automatic detection of all connected components will be
executed.
After logging in, the components are initialized and polled. The current values are
displayed in the status window:
Furnace temperature: The preheating time is approximately 30 to 40 minutes,
depending on the target temperature.
Wide-range coulometer: approx. 10 min warm-up time.
NDIR detector (only for TOC determination): This assembly has a warm-up time of
approx. 15 min. after the TOC module is switched on.
In the status window the displays for the components that are not yet ready for
operation are red during this time.
Warm-up and run-in
phases
Содержание Analytik Jena Multi X 2500
Страница 1: ...Operating Manual multi X 2500 ...