3.4.
Power-up and Shutdown Procedure
After the installation, please follow the procedure below to power up and shut down the
unit.
3.4.1.
Inspection
Overview
●
Please follow the nominal voltage listed in the nameplate.
●
System electrical connected correctly.
●
All connections are tight.
●
The rating value of the circuit breaker or fuse is correct.
Before operation, please check the status of every unit according to table 3-5.
Table 3-5 Checklist
Inspection Items
Checking details and requests.
Unit appearance.
Appearance without damage, surface is clean,
insulation is in good condition.
Electric line
Power supply connection should not be loose.
Measure and record the voltage value before
starting up the unit.
Electric control box
The electrical components of the control box are
good.
Top cooling unit
No blocked-on air inlet and air outlet spot.
3.4.2.
Power-up procedure
●
Turn on the breakers
Follow the procedure (refer to Figure 3-15) to power up the unit.
Turn on the breakers on the power distribution module; refer to Figure 3-14
Figure 3-14 Power distribution module Breaker
25