background image

Doc. No: 09900010 

Revision: H 

3 of 5 

Issue Date: 11/05/21 

OPERATION AND MAINTENANCE 

1.  Keep tray closed to protect eyewash heads and shut off flow. Do not lean on tray when in open position. 
2.  Clean the vessel with mild soap and water as needed. Rinse well and refill with potable water to appropriate fill-line and 

add Hydrosep

®

 water preservative. 

3.  Unit should be drained, flushed, and refilled with clean potable water and Hydrosep

®

 water preservative. Encon 

recommends cleaning and replacing the fluid every 90 to 120 days (not to exceed 180 days). Follow the directions 
printed on the Hydrosep

®

 bottle. 

4.  Unit should be activated for 15 seconds to flush lines and inspected annually to verify proper operation. Refill to 

appropriate fill-line after each test and add Hydrosep

®

 water preservative if six gallons (cumulative) or more is used 

during the testing procedures. Inspection should include examination of hose connecting reservoir and basin, and 
reservoir should be free of fungi, algae or other foreign materials. 

5.  Test records should be maintained verifying compliance with testing procedures. 

COMPONENT LIST FOR TRANSPORT CART 

1. 

Base Plate (1) 

11.  Bolt, ¼”-20 x 2½”lg (4) 

2. 

Front Leg (2) 

12.  Bolt, ¼"-20 x 2¾"lg (2) 

3. 

Upper Support (1) 

13.  Bolt, ¼”-20 x 1½”lg (6) 

4. 

Rear Leg (2) 

14.  Bolt, ¼"-20 x 1¾"lg (4) 

5. 

Upper Frame (1) 

15.  Bolt, ¼”-20 x ¾”lg (16) 

6. 

Lower Support (1) 

16.  Lock Nut ¼”-20 (28) 

7. 

Axle (1) 

17.  Flat Washer ⅝” (4) 

8. 

Locking Caster (2) 

18.  Cotter Pin (2) 

9. 

10” Wheel (2) 

19.  Stop Plate (1) 

10.  Axle Support (2) 

20.  Hand Grip (2) 

TOOLS REQUIRED 

1.  Hammer 
2.  Pliers 
3.  7/16” Wrench (2) 

INSTALLATION INSTRUCTIONS FOR TRANSPORT CART 

1.  Attach stop plate to base plate with two ¼”-20 x ¾” bolts and lock nuts. 
2.  Insert post on locking caster in base plate sockets, until caster locks. Note orientation on base plate. Ensure that the gap 

on the tension ring of the locking castor post does not align with the weld seam in the socket. Repeat step on other side. 

3.  Attach axle support to base plate, using two ¼”-20 x ¾” bolts and lock nuts. Repeat step on other side. 
4.  Insert axle through two axle supports 
5.  Place 10” wheel on axle with flat washer on each side on wheel. Repeat step on other side. 
6.  Install cotter pin through hole on axle to secure 10” wheel. Repeat step on other side. 
7.  Install front leg to base assembly using two ¼”-20 x ¾” bolts and lock nuts. 
8.  Install rear leg to base assembly using two ¼”-20 x ¾” bolts and lock nuts. Do not attach front leg to rear leg. 
9.  Repeat steps 7 and 8 for other side of unit. 
10.  Insert upper frame into mating hole on front leg. Secure upper frame to front legs using four ¼”-20 x 2½” bolts and lock 

nuts. 

11.  Slip hand grip onto rear leg, two places. 
12.  Attach upper support to upper frame using four ¼”-20 x 1½” bolts and lock nuts. 
13.  Attach long surface of lower support to upper frame using two ¼”-20 x 1½” bolts and lock nuts as shown. Note 

orientation and location of lower support.  

14.  Attach J-Hook to hole in upper support using two ¼”-20 x ¾” bolts and lock nuts as shown. J-hook supplied with Gravity 

Fed eyewash.  

15.  Place Gravity Fed Eyewash and receptacle on cart as shown in 

Figure 4 

below. 

16.  Test for proper operation. 
17.  Place station in desired location.  Lock front wheels by depressing silver tab on wheels.

 

 

 

Содержание 01104050

Страница 1: ... Only PRODUCT DESCRIPTION Portable 14 Gallon Self Contained Gravity Fed Eyewash units for use in areas where plumbed potable water is not available Units are designed for wall mounting or mounting on a transport cart as well as a stand alone on a shelf COMPONENT LIST FOR GRAVITY FED Ref Figure 3 below A Gravity Fed Eyewash B J Hook 1 C Hydrosep Water Preservative not shown FIGURE 1 MODEL 01104050 ...

Страница 2: ... top of the eyewash pattern should reach between 33 83 8cm to 53 134 6cm 3 When mounting on a shelf tray should be able to fully open without any obstacles 4 When wall mounting install J hook to proper support beam 49 61 124 5 154 9cm from the floor to the top of the J hook using proper mounting screws mounting screws are not included See Figure 1 on page 1 for reference 5 When mounting on Encon t...

Страница 3: ... REQUIRED 1 Hammer 2 Pliers 3 7 16 Wrench 2 INSTALLATION INSTRUCTIONS FOR TRANSPORT CART 1 Attach stop plate to base plate with two 20 x bolts and lock nuts 2 Insert post on locking caster in base plate sockets until caster locks Note orientation on base plate Ensure that the gap on the tension ring of the locking castor post does not align with the weld seam in the socket Repeat step on other sid...

Страница 4: ...e for 15 minutes prior to medical treatment It is important to hold the eyelids open and roll the eyes so water will flow on all surfaces and in the folds surrounding the eyes SPARE PARTS LIST 01110764 Hydrosep Water Preservative 4 pack 8 oz bottles 01110792 Replacement Discharge Hose Kit 01110720 Male Latch 01110721 Female Latch 01110738 J Hook ACCESSORIES 01110729 Drain Tray Kit 01110700 Transpo...

Страница 5: ...f original ownership as proof of warranty coverage and Encon must receive any claim under this Limited Warranty within one year of purchase of the product NOTWITHSTANDING ANYTHING TO THE CONTRARY CONTAINED HEREIN ENCON SHALL NOT BE LIABLE FOR LOSS DAMAGE OR EXPENSE ARISING DIRECTLY OR INDIRECTLY AS A CONSEQUENCE OF USE OF THE EQUIPMENT WITH OTHER PRODUCTS OR FROM ANY OTHER CAUSE INCLUDING ANY CONS...

Отзывы: