background image

 

 

ONE STOP MONITORING SOLUTIONS | HYDROLOGY | GEOTECHNICAL | STRUCTURAL | GEODETIC 

Over 50 years of excellence through ingenuity

 

USERS’ MANUAL 

ENCARDIO-RITE ELECTRONICS PVT. LTD. 

A-7, Industrial Estate, Talkatora Road Lucknow, UP - 226011, India | P: +91 522 2661039-42 | Email: [email protected] | www.encardio.com 

International: UAE | Qatar | Bahrain | Bhutan | 

Europe | 

USA 

India: Lucknow | Delhi | Kolkata | Mumbai | Chennai | Bangalore | Hyderabad | J&K 

Doc. # WI 6002.103 R02 | Nov 2018 

DIGITAL INCLINOMETER 

OPERATION

 

MODEL EAN-26 

Содержание EAN-26

Страница 1: ...RITE ELECTRONICS PVT LTD A 7 Industrial Estate Talkatora Road Lucknow UP 226011 India P 91 522 2661039 42 Email geotech encardio com www encardio com International UAE Qatar Bahrain Bhutan Europe USA...

Страница 2: ...Saving borehole log 14 4 2 Viewing data 15 4 3 Viewing data in table 15 4 3 1 Viewing data on graph 16 4 4 Borehole files storage 17 4 5 Borehole log database manager 17 4 5 1 Selecting multiple log f...

Страница 3: ...26 7 3 Backing up the borehole logs 27 8 RESTORING INCLINOMETER DATA 29 8 1 Restoring the inclinometer database 29 8 2 Restoring borehole logs 29 9 TROUBLESHOOTING 31 9 1 Unable to connect Bluetooth 3...

Страница 4: ...oing to be used for more than 30 days recharge the battery at least once every 30 days or so When battery voltage is showing 7 3V in system information screen at Readout unit it means approximately 10...

Страница 5: ...are required for a biaxial inclinometer survey for each depth level in a bore hole In case of any error during logging the probe can be lowered back to the problem depth and logging continued without...

Страница 6: ...vertical inclinometer probe can measure the tilt along a vertical plane passing through the probe axis A biaxial inclinometer probe can measure the tilt independently along two vertical planes that ar...

Страница 7: ...reel is designed for use with variety of digital inclinometer probes from Encardio rite The probe calibration is independent of the Reel configuration The EAN 26MV digital Inclinometer probe uses two...

Страница 8: ...four grooves in an inclinometer casing that has been chosen to be the reference groove After the first run is over the inclinometer probe is taken out of the casing and rotated 180 degrees and reinser...

Страница 9: ...Inclinometer system is using Bluetooth connection for communicating Phone with Reel Connect the probe with Reel Turn ON the Reel by pressing push button provided on Reel s disk near battery holder On...

Страница 10: ...graph using view data option Borehole files can be uploaded to a remote server using upload files button Borehole logged database can be managed using database manager option Site list shows the list...

Страница 11: ...5 1 Inclinometer information Inclinometer screen shows the information about reel and the probe Figure 5 9 is showing an example of inclinometer screen of a reel It is showing the Reel s battery volt...

Страница 12: ...te and Borehole menu can be opened on pressing create site button from main menu Figure 5 13 shows the site and borehole menu On pressing create button under site list it will open site creation menu...

Страница 13: ...ault borehole selection menu Choose desired borehole to import parameters from Figure 5 16 is showing an example of default borehole selection menu Any borehole can be deleted by selecting a borehole...

Страница 14: ...reading button from main menu Pressing on take reading button from main menu it will open reading screen as shown in figure 5 18 Lower the probe into borehole at depth showing on phone s screen Axis...

Страница 15: ...en Once accept button is pressed it will save the reading and the depth and moved to next interval 9 5 meters in this case Pull the probe and fix it at 9 5 meters marking Wait until readings are stabl...

Страница 16: ...N button can be used to reach the desired probe position Verify all readings at different intervals up to which readings are doubtful Application automatically exits from EDIT mode when highest logged...

Страница 17: ...Set noise limit can be seen in terms measurement units Stable window can be adjusted depending on how noisy the readings are in the field It is recommended to keep stable window minimum 4 1 11 Saving...

Страница 18: ...utton Figure 5 25 shows reset base file menu Choose a borehole file to set it base file and press OK View data menu figure 5 24 will show a list of borehole logs which are taken later to base file Sel...

Страница 19: ...e can plot data on graph on pressing view graph button Use phone s back key to exit from this menu 4 3 1 Viewing data on graph On pressing view graph button from view data menu figure 5 24 application...

Страница 20: ...hese CSV files are borehole log files generated while saving borehole log after taking readings refer section 5 1 11 Archive folder is used to keep uploaded files refer section 5 6 Figure 5 29 showing...

Страница 21: ...p down menu To filter log list based on borehole select option by site and borehole and choose a site using drop down menu and then select borehole for which we want to see the logs To filter log list...

Страница 22: ...So use this button when actually required 4 5 3 Creating files from borehole database Borehole files CSV DI1 can be created using create files button from database manager menu figure 5 30 Select bore...

Страница 23: ...carefully Letters are case sensitive Press save button to save new password Remember this password for use in future 4 6 2 Forgot password If user forgets database deletion password then it can be re...

Страница 24: ...ddress Provide port number of the FTP server Enter user name and password for authentication After providing all credentials press on save button to update URL settings Make sure that mobile phone hav...

Страница 25: ...w press on upload button to upload selected files to FTP server Uploaded files will be moved to archive folder on successful completion of upload process Press cancel button to exit from this menu Ref...

Страница 26: ...e B 5 1 Face error Face error is calculated using expression given below Face error should be almost constant with very small variations at every interval Ideally it should be zero Large and inconsist...

Страница 27: ...spread sheet programs for formatted printing and graphical plotting It can also be imported in GTilt INCLINOMETER DATA SITE CODE Lucknow BOREHOLE CODE Charbag FACES LOGGED ABCD TIME DATE TAKEN 10 54 O...

Страница 28: ...nated with a CR LF character ER DIV1 0 Borehole Data File SITECODE BOREHOLEID MAXDEPTH DATE TIME A 0 0 A 0 5 A 1 0 A 1 5 A 9 5 A 10 0 B 0 0 B 0 5 B 9 5 B 10 0 Lucknow Talktra 10 0 2011 08 11 10 46 07...

Страница 29: ...ata cable phone will ask for connection type Choose connection type to Disk Drive and then click on Done A popup screen will appear on Desktop laptop s screen see figure 8 1 Select open folders to vie...

Страница 30: ...ntents This folder contains two sub folders CSV files and web view files see figure 8 4 Open folder CSV files to view CSV files folder contents Figure 8 5 is showing an example of CSV files folder con...

Страница 31: ...pen folder Web view files to view Web view files folder contents Figure 8 6 is showing an example of Web view files folder contents Select the files which backups are to be taken Copy these files to a...

Страница 32: ...database Copy the preserved inclinometer database from safe location i e network servers etc Open folder DB_Inclino to view database folder contents Paste the database here and overwrite the existing...

Страница 33: ...ration Page 30 Copy the preserved inclinometer Web view files from safe location i e network servers etc Open folder Web view files to view Web view files folder contents Paste the selected Web view f...

Страница 34: ...Unable to connect to the probe Probe connector may be loose Turn OFF the Reel and reconnect the probe with reel cable and then turn ON the Reel Check the probe s connector for damage Reel s cable may...

Отзывы: