Locating Electric Supply

A 7/8" (22mm) diameter knockout is provided at the bottom of the
left and right side panels. A three-prong (grounding) plug assembly
is located within the control compartment (bottom) of the furnace.
Please remove 7/8" (22mm) knockout from appropriate side panel
when routing plug assembly to an electrical outlet. Unit can be
hard wired when recessed. Remove the 3 prong plug assembly and
terminate inside the unit junction box.

R ECESS ED MOUNTI NG  
LOCATION

8"

4"

4"

2 1/8"

GAS LINE 
HOLE 1 1/4"

ELECTR ICAL WIR ING HOLE 

GAS LINE/ELECTRI CAL OP ENINGS FOR
R ECESS ED AND SUR FACE MOUNT

Figure 7

Installation of Three-prong (Grounding) Plug Assembly

1. Disconnect nylon cap on 3' (92cm) plug assembly from nylon

plug on wiring harness. Remove 3' (92cm) plug assembly from
control compartment (bottom) of the furnace.

2. Remove 7/8" (22mm) knockout from appropriate side panel.
3. Insert nylon cap on 3' plug assembly into the 7/8" (22mm) hole

in the side panel.

4. Connect nylon cap on 3' (92cm) plug assembly to nylon plug on

the wiring harness.

5. Place 7/8" (22mm) strain relief bushing around the cord of the

3' (92cm) plug assembly. Insert 7/8" (22mm) strain relief
bushing into the 7/8" (22mm) hole in the side panel.

Attention! 

The 7/8" (22mm) strain relief bushing is located within

the same envelope as the Installation Instructions and Owner's
Manual.

Attaching Furnace to Wall

Refer to Figure 5 for the location of the 7 1/2" (191mm) diameter
wall opening for the furnace. After the wall opening has been
located and cut, position flue outlet on furnace in center of wall
opening. When attaching furnace to the wall remove that portion
of baseboard and molding on the wall which is behind the furnace.
Attach furnace to wall, at the outer casing top, with (2) toggle bolts
provided and to floor, at the outer casing bottom, with (2) #10 x 1
1/2" (38mm) screws provided.

Cutting Vent Tubes

This is the most important part of the installation. With the furnace
installed on wall the 6" (152mm) diameter air inlet tube and the 4"
(102mm) diameter flue outlet tube are to be marked and cut using
the following procedure.
1. Attach 6" (152mm) diameter air inlet tube onto the collar of air

drop assembly. Be sure 6" (152mm) diameter air inlet tube is
placed as far as possible onto the collar of the air drop assembly.
Mark the 6" (152mm) diameter air inlet tube 1/2" (13mm)
beyond the outside wall. Remove 6" (152mm) diameter air inlet
tube from collar of air drop assembly.

2. Attach 4" (102mm) diameter flue outlet tube onto flue outlet

collar on combustion chamber. Be sure 4" (102mm) diameter
flue outlet tube is placed as far as possible onto the collar of flue
outlet. Mark the 4" (102mm) diameter flue outlet tube 2 1/4"
(57mm) beyond the outside wall. Remove 4" (102mm) diameter
flue outlet tube from collar of flue outlet on combustion
chamber.

3. Mark or wrap tape completely around the tubes at the marked

points to help in making a true cut. Do not crimp or enlarge
tubes.

Installing Vent Assembly (See Figure 8)

1. Place provided caulking beneath the edge of the outside mounting

plate. Use additional caulking to correct uneven wall surface,
such as clapboard.

2. Attach 6" (152mm) diameter air inlet tube onto the collar of air

drop assembly. Attach caulked, outside mounting plate into the
6" (152mm) diameter air inlet tube. Position the outside mounting
plate so that 6" (152mm) diameter air inlet tube has a slight
downward slope to the outside. 

The downward slope is

necessary to prevent the entry of rainwater.

 Attach outside

mounting plate to exterior wall with (4) #10 x 1 1/2" (38mm)
screws provided.

3. Apply furnace cement or RTV silicone sealant to 4" (102mm)

diameter flue outlet collar on combustion chamber and to 4"
(102mm)  diameter collar on vent cap. Attach 4" (102mm)
diameter flue outlet tube onto flue outlet collar on combustion
chamber. Attach vent cap into the 4" (102mm) diameter flue
outlet tube. Attach vent cap to outside mounting plate with (3)
#10 x 1/2" (13mm) screws provided.

4. Installation is completed.

Figure 8

Reassembly And Resealing Vent-Air Intake System

When vent-air intake system is removed for servicing the furnace,
the following steps will assure proper reassembly and resealing of
the vent-air intake assembly.
1. Remove old caulking beneath the edge of the outside mounting

plate. Apply new caulking beneath the edge of the outside
mounting plate. Use additional caulking to correct uneven wall
surface, such as clapboard.

2. Remove old furnace sealant from flue outlet collar on combustion

chamber and collar of vent cap. Remove old furnace sealant
from both ends of 4" (102mm) diameter flue outlet tube.

Содержание DVC-35-1IP

Страница 1: ...plier s instructions Ifyoucannotreachyourgassupplier call the fire department Installation and service must be per formed by a qualified installer service agency or the gas supplier WARNING If not ins...

Страница 2: ...Standing Pilot Lighting Instructions 11 DVC 35IP Intermittent Pilot Lighting Instructions 12 Pilot Flame Characteristics 13 Main Burner Flame Characteristics 14 Wiring 14 15 Service and Maintenance S...

Страница 3: ...by a qualified service person More frequent cleaning may be required due to excessive lint from carpeting bedding materials etc It is imperative that control compartments burners andcirculatingairpass...

Страница 4: ...service or make adjustments in an area where the conditions are such that you may not detect the odor if there has been a leak of LP Gas Odor fade due to oxidation by rust or adsorption on walls of n...

Страница 5: ...ing vehicle Qualified Installing Agency Installationandreplacementofgaspiping gasutilizationequipment or accessories and repair and servicing of equipment shall be performedonlybyaqualifiedagency Thet...

Страница 6: ...orized installer for installation or relocation Compoundsusedonthreadedjointsofgaspipingshallberesistant to the action of liquefied petroleum gases The gas lines must be checked for leaks by the insta...

Страница 7: ...ts in unsatisfactory performance 3 The DVC 35 can be attached to the wall or recessed into the wall up to 9 1 2 241mm in depth but the minimum 3 4 19mm vent air intake system wall depth must be main t...

Страница 8: ...1 25mm provided screws 9 Installation of SOR 1 is completed Side outlet kit SOK 1 10 254mm boot assembly with regis ter for warm air discharge into an adjoining room may be installed on either side o...

Страница 9: ...2mm diameter air inlet tube is placedasfaraspossibleontothecollaroftheairdropassembly Mark the 6 152mm diameter air inlet tube 1 2 13mm beyondtheoutsidewall Remove6 152mm diameterairinlet tube from co...

Страница 10: ...the wind on one side of the air inlet section will result in back pressure on the flue section smothering the flame and eventual pilot outage When the vent cap is to be installed on vinyl siding or i...

Страница 11: ...control knob slightly and turn clock wise to OFF Do not force 5 Replace control access panel lower front panel LIGHTING INSTRUCTIONS 1 STOP Read the safety information above 2 Set the thermostat to l...

Страница 12: ...n to inspect the appliance and to replace any part of the control system and any gas control which has been under water 1 STOP Read the safety information above 2 Set the thermostat to lowest setting...

Страница 13: ...tor which lights a pilot that in turn lights the main burner The gas valve used in this system is a step opening whichopensatalowerpressureforignitionandthenstepstoafull inlet pressure of 4 H2 O press...

Страница 14: ...r in the absence of local codes with the National Electrical Code ANSI NFPA 70 or Canadian Electrical Code CSA C22 1 if an external electrical source is utilized This appliance is equipped with a thre...

Страница 15: ...OUTLET PRESSURE REGULATOR ADJUSTMENT UNDER CAP SCR EW GAS FLOW IG NITOR C ONTROL TO 24 V THERMOSTA T TO 24 V COMMON ON TRANSFOR MER TO 24V HOT ON TRANSFORMER WIRING I P MODEL GAS VALVE AND WIRING IGNI...

Страница 16: ...Check pilot adjustment for being full open counterclockwise to open 3 Ifgasisavailableinthesupplytubing thepilotorificeand orpilotburnerisprobablyrestrictedbyaspiderweb Clean pilot assembly and religh...

Страница 17: ...Second Flame Failure Recycle Delay YES YES YES NO Pilot Valve Ignition OFF Wait for Flame Signal to Disappear 1 Ignitor will turn OFF about 30 seconds into the trial for ignition if the pilot flame ha...

Страница 18: ...and Back ON Main Burner Lights Replace SmartValve Control Check Transformer and Line Volt Supply Check that Pilot Flame Makes Good Contact with Pilot Burner Flame Rod Check for Good Electrical Connect...

Страница 19: ...666 INNERFRONTASSEMBLY CANADA 21 DV 1253 INNERSHIELDCOVERPLATE 2 REQUIRED 22 DV 1252 INNERSHIELD LEFT INCLUDES NO 22 23 DV 1257 EXCHANGERASSEMBLY 24 R 3162 FILTER 25 R 3163 FILTERRETAINER 26 R 3232 PI...

Страница 20: ...VIEW Empire Comfort Systems Inc Nine Eighteen Freeburg Ave Belleville Illinois 62220 2623 PH 1 800 851 3153 PH 1 618 233 7420 FAX 1 800 443 8648 FAX 1 618 233 7097 E MAIL info empirecomfort com WEB S...

Отзывы: