Startup procedure
3.1
Introduction
CAUTION
EQUIPMENT DAMAGE
Damage to the analyzer may result from a failure to follow this procedure.
Always follow the startup procedure.
The analyzer normally operates continuously. It should only be necessary to start up the
analyzer under the following circumstances:
•
When the analyzer is first switched on following installation.
•
Following repair or maintenance.
•
When the analyzer has been switched off as part of a plant shutdown or maintenance.
3.2
Preparation for use
The analyzer must be installed and fully commissioned prior to startup.
WARNING
BURNS
Failure to allow sufficient cooling may cause serious burn injury to personnel.
Do not touch any part of the analyzer.
Assume all parts of the analyzer are hot unless it has been switched off and allowed to
cool down.
Some parts of the analyzer may be heated to 150 °F (65 °C).
Always wear proper protective equipment when handling the analyzer.
Switch off the analyzer and allow it to cool for at least two hours before fitting,
removing, or performing any maintenance.
The analysis cell is insulated against heat loss. Allow the analyzer to cool for at least
twelve hours before performing any maintenance on, or in the vicinity of, the analysis
cell.
Reference Manual
Startup procedure
00809-0100-5800
September 2019
Rosemount CT5800
57
Содержание Rosemount CT5800
Страница 1: ...Reference Manual 00809 0100 5800 Rev AA September 2019 Rosemount CT5800 Continuous Gas Analyzer ...
Страница 20: ...Contents Reference Manual September 2019 00809 0100 5800 xx Emerson com Rosemount ...
Страница 34: ...Plan Reference Manual September 2019 00809 0100 5800 34 Emerson com Rosemount ...
Страница 46: ...Figure 2 6 Earth Bond Install Reference Manual September 2019 00809 0100 5800 46 Emerson com Rosemount ...
Страница 60: ...Startup procedure Reference Manual September 2019 00809 0100 5800 60 Emerson com Rosemount ...
Страница 70: ...Operating the analyzer Reference Manual September 2019 00809 0100 5800 70 Emerson com Rosemount ...
Страница 80: ...Verifying gas concentrations Reference Manual September 2019 00809 0100 5800 80 Emerson com Rosemount ...
Страница 90: ...Gas calibration Reference Manual September 2019 00809 0100 5800 90 Emerson com Rosemount ...
Страница 162: ...Troubleshooting and diagnostics Reference Manual September 2019 00809 0100 5800 162 Emerson com Rosemount ...
Страница 168: ...Shutdown procedure Reference Manual September 2019 00809 0100 5800 168 Emerson com Rosemount ...
Страница 170: ...Preventative maintenance Reference Manual September 2019 00809 0100 5800 170 Emerson com Rosemount ...
Страница 176: ...ATEX IECEx Assessment Report Summary Reference Manual September 2019 00809 0100 5800 176 Emerson com Rosemount ...
Страница 178: ...Theory of operation Reference Manual September 2019 00809 0100 5800 178 Emerson com Rosemount ...
Страница 180: ...Spare parts list Reference Manual September 2019 00809 0100 5800 180 Emerson com Rosemount ...
Страница 187: ...Engineering Drawings Reference Manual September 2019 00809 0100 5800 182 Emerson com Rosemount ...