Figure 10-9: Input Type
Figure 10-10: Calibration
13. Use the
LEFT, RIGHT, INCR
(increase), and
DECR
(decrease) buttons to enter the
desired offset (in the example above, 1.06 ppm).
14. Press
OK
to confirm.
The factory default span factor is one, and under normal circumstances, the offset
should be between 0.8 and 1.2.
10.2.1
Zero calibrate an individual gas
Procedure
1. To get the
Main menu
, press the
MENU
button on the
Gas Sensor Main
screen
Pressure and Temperature
).
NOTICE
Pressing the
BACK
button will cancel the procedure and return the user to the
previous screen.
Gas calibration
Reference Manual
October 2019
00809-0100-4512
98
Rosemount CT5100(Ex)
Содержание Rosemount CT5100
Страница 1: ...Reference Manual 00809 0100 4512 Rev AA October 2019 Rosemount CT5100 Ex Continuous Gas Analyzer ...
Страница 16: ...16 ...
Страница 20: ...Contents Reference Manual October 2019 00809 0100 4512 xx Rosemount CT5100 Ex ...
Страница 28: ...Theory of operation Reference Manual October 2019 00809 0100 4512 28 Rosemount CT5100 Ex ...
Страница 46: ...Specifications Reference Manual October 2019 00809 0100 4512 46 Rosemount CT5100 Ex ...
Страница 66: ...Install Reference Manual October 2019 00809 0100 4512 66 Rosemount CT5100 Ex ...
Страница 84: ...Start up procedure Reference Manual October 2019 00809 0100 4512 84 Rosemount CT5100 Ex ...
Страница 92: ...Shutdown procedure Reference Manual October 2019 00809 0100 4512 92 Rosemount CT5100 Ex ...
Страница 112: ...Gas calibration Reference Manual October 2019 00809 0100 4512 112 Rosemount CT5100 Ex ...
Страница 172: ...ATEX IECEX assessment report summary Reference Manual October 2019 00809 0100 4512 172 Rosemount CT5100 Ex ...