Quick Start Guide

00825-0100-3560, Rev AA

April 2020

Rosemount

 Clarity II T1056

Turbidmeter

Turbidity Measurement System

Содержание Rosemount Clarity II T1056

Страница 1: ...Quick Start Guide 00825 0100 3560 Rev AA April 2020 Rosemount Clarity II T1056 Turbidmeter Turbidity Measurement System ...

Страница 2: ...pecified in the installation instructions of the appropriate Reference Manual and per applicable local and national codes Connect all products to the proper electrical and pressure sources Use only factory documented components for repair Tampering or unauthorized substitution of parts and procedures can affect the performance and cause unsafe operation of your process All equipment doors must be ...

Страница 3: ...the date of intial installation or eighteen 18 months from the date of shipment by Seller whichever period expires first Consumables such as glass electrodes membranes liquid junctions electrolyte O rings catalytic beads etc and services are warranted for a period of 90 days from the date of shipment or provision Products purchased by Seller for resale to Buyer Resale Products shall carry only the...

Страница 4: ...only in a writing signed by an authorized representative of Seller Except as otherwise expressly provided in the Agreement THERE ARE NO REPRESENTATIONS OR WARRANTIES OF ANY KIND EXPRESSED OR IMPLIED AS TO MERCHANTABILITY FITNESS FOR PARTICULAR PURPOSE OR ANY OTHER MATTER WITH RESPECT TO ANY OF THE GOODS OR SERVICES Contents Install 5 Wire 16 EU Declaration of Conformity 26 China RoHS Table 28 Quic...

Страница 5: ...1056 03 27 38 HT Dual input turbidity transmitter with HART 1056 03 27 38 HT Sensor EPA standards 8 0108 0002 EPA Sensor ISO standard 8 0108 0003 ISO Cable 3 ft 0 9 m 2413800 Cable 20 ft 6 1 m 2409700 Cable 50 ft 15 2 m 2409800 Calibration cup 2410100 Molded chamber debubbler 24170 00 Note The transmitter model number is printed on a label attached to the side of the instrument 1 2 Install 1 2 1 G...

Страница 6: ...itter is suitable for panel pipe or surface mounting Refer to the figures below WARNING Electrical shock Electrical installation must be in accordance with the National Electrical Code ANSI NFPA 70 and or any other applicable national or local codes Do not operate or energize instrument with case open Quick Start Guide April 2020 6 Emerson com Rosemount ...

Страница 7: ...upplied by others Maximum thickness 3 75 in 9 52 mm B 4X mounting brackets and screws provided with instrument Note Panel mounting seal integrity 4 4X for outdoor applications is your responsibility April 2020 Quick Start Guide Quick Start Guide 7 ...

Страница 8: ...Figure 1 2 Wall Mounting Dimensions A 4X cover screw Quick Start Guide April 2020 8 Emerson com Rosemount ...

Страница 9: ...penings D 2 in pipe mount bracket E 2X set U bolts for 2 in pipe in kit PN 23280 00 The front panel is hinged at the bottom The panel swings down for easy access to the wiring locations 1 3 Install debubbler assembly See Figure 1 4 for installation April 2020 Quick Start Guide Quick Start Guide 9 ...

Страница 10: ...ecommended installation of the sample port 2 Attach a piece of in ID soft tubing to the drain fitting The debubbler must drain to atmosphere WARNING High pressure and temperature Before removing the sensor be absolutely certain that the process pressure is reduced to 0 psig and the process temperature is lowered to a safe level Quick Start Guide April 2020 10 Emerson com Rosemount ...

Страница 11: ...ed from the flow rate See Table 1 2 Table 1 2 Approximate Debubbler Pressure as a Function of Flow 0 040 Inch Outlet Orifice gph psig mL min kPa abs 2 1 100 110 4 3 200 120 6 8 300 140 8 14 400 160 10 21 500 190 11 26 600 240 12 31 700 280 800 340 To control and monitor sample flow a valved rotameter with fittings is available PN 24103 00 3 Attach the rotameter to the debubbler outlet You can also...

Страница 12: ... Replace the nut 4 Remove the protective cap from the sensor 5 Screw the cable onto the receptacle The plug and receptacle are keyed for proper alignment The sensor is rated to IP65 when properly connected to the cable Postrequisites To prevent possible water damage to the connector contacts be sure the cable receptacle and the connector on the back of the sensor are dry when connecting or disconn...

Страница 13: ...idity If possible install a sampling port that extends one or two inches 25 50 mm into the pipe Use 1 4 in OD rigid plastic tubing Avoid soft plastic tubing if possible To reduce sample lag time install the debubbler and flow chamber as close to the sample tap as possible April 2020 Quick Start Guide Quick Start Guide 13 ...

Страница 14: ...al conduit WARNING Flammable Use with non flammable process media only Note A Installation must conform to the CEC B Seal required at each conduit entrance C During installation leave maximum amount of jacket insulation possible on N I field wiring within instrument enclosure After termination wrap N I field wiring within enclosure with mylar tape to ensure adequate double insulation remains Unles...

Страница 15: ...n Incendive Field Wiring Connection for Class 1 Division 1 Group D Turbidity sensor board Option 27 37 turbidity May only be used with a Clarity II Turbidity Sensor April 2020 Quick Start Guide Quick Start Guide 15 ...

Страница 16: ...d board fully into the enclosure slot and take up the excess sensor cable through the cable gland 3 Tighten the cable gland nut to secure the cable and ensure a sealed enclosure 2 1 3 Digital communication boards 2 1 4 Alarm relays Emerson supplies four alarm relays with the switching power supply 85 to 264 Vac 03 order code and the 24 Vdc power supply 20 30 Vdc 02 order code You can use all relay...

Страница 17: ... fitting to the transmitter UL508 26 16 2 3 Prepare sensor cable The Rosemount T1056 is intended for use with all Rosemount sensors Refer to the sensor installation instructions for details on preparing sensor cables 2 4 Power output and sensor connections 2 4 1 Power wiring Emerson offers two power supplies for the Rosemount T1056 1 24 Vdc 20 30 V power supply 02 ordering code 2 85 265 Vac switch...

Страница 18: ...g connectors with each unit For best EMI RFI protection use shielded output signal cable enclosed in an earth grounded metal conduit Connect the shield to earth ground AC wiring should be 14 gauge or greater Provide a switch or breaker to disconnect the analyzer from the main power supply Install the switch or breaker near the analyzer and label it as the disconnecting device for the analyzer Keep...

Страница 19: ...ire the relay leads on each of the independent relays to the correct position on the power supply board using the printed lead markings NO Normally open NC Normally closed or Com Common on the board See Figure 2 3 Figure 2 3 Alarm Relay Wiring for Rosemount 1056 Switching Power Supply 03 Order Code Table 2 1 Performance Specifications NO1 Relay 1 COM1 NC1 April 2020 Quick Start Guide Quick Start G...

Страница 20: ...to the turbidity signal board mating connector WARNING Electrical shock Electrical installation must be in accordance with the National Electrical Code ANSI NFPA 70 and or any other applicable national or local codes 2 4 5 Wire sensor cable The sensor cable is pre wired to a plug that inserts into a receiving socket on the signal board See Figure 2 4 Quick Start Guide April 2020 20 Emerson com Ros...

Страница 21: ...and screw it onto the fitting 4 Loosen the cable nut so the cable slides easily 5 Insert the plug into the appropriate receptacle To remove the plug squeeze the release clip and pull straight out 6 Adjust the cable slack in the enclosure and tighten the cable nut Be sure to allow sufficient slack to avoid placing stress on the cable and connections 7 Plug the cable into the back of the sensor The ...

Страница 22: ...let Important When using EPA incandescent sensors P 8 0108 0002 EPA Do not power up the instrument without the sensor connected Do not disconnect and reconnect a sensor while a transmitter is powered If this is inconvenient or cannot be avoided Cycle power to the instrument after connecting to the sensor or Perform a slope calibration or standard calibration routine after connecting the sensor Fol...

Страница 23: ...Figure 2 5 Power Wiring for Rosemount 1056 85 265 Vac Power Supply 03 Ordering Code A To main board B Earth ground C Neutral D Line April 2020 Quick Start Guide Quick Start Guide 23 ...

Страница 24: ...Figure 2 6 Power Wiring for Rosemount 1056 254 Vdc Power supply 02 Ordering Code A To main PCB Quick Start Guide April 2020 24 Emerson com Rosemount ...

Страница 25: ... 7 Output Wiring for Rosemount 1056 Main PCB A To power supply PCB B Analog output 1 C Analog output 2 D To digital I O PCB E To sensor 1 PCB F To sensor 2 PCB April 2020 Quick Start Guide Quick Start Guide 25 ...

Страница 26: ...A EU Declaration of Conformity Quick Start Guide April 2020 26 Emerson com Rosemount ...

Страница 27: ...April 2020 Quick Start Guide Quick Start Guide 27 ...

Страница 28: ...B China RoHS Table Quick Start Guide April 2020 28 Emerson com Rosemount ...

Страница 29: ...April 2020 Quick Start Guide Quick Start Guide 29 ...

Страница 30: ...Quick Start Guide April 2020 30 Emerson com Rosemount ...

Страница 31: ...April 2020 Quick Start Guide Quick Start Guide 31 ...

Страница 32: ...E EAST AND AFRICA Emerson Automation Solutions Emerson FZE Jebel Ali Free Zone Dubai United Arab Emirates P O Box 17033 971 4 811 8100 971 4 886 5465 RMTNA RCCPO Emerson com ASIA PACIFIC Emerson Automation Solutions 1 Pandan Crescent Singapore 128461 Republic of Singapore 65 6 777 8211 65 6 777 0947 RMTNA RCCPO Emerson com LinkedIn com company Emerson Automation Solutions Twitter com rosemount_new...