Emerson PT5-30L-FLR Скачать руководство пользователя страница 1

 

 

Operating Instructions 

Pressure Transmitter 

PT5 Versions released for R290 

 

 

 

General Information: 

Pressure Transmitters convert a pressure into a linear 
electrical output signal. 
PT5...FLR meets explosion protection requirements 
for electrical equipment, equipment group II, 
equipment categories 3G, in  ignition protection class 
“nC” as hermetically sealed device in explosion group 
IIB and temperature class T4. They are marked with: 

  II 3G Ex nC IIB T4 Gc X

 

 

PT5…FLR  must be installed in an appropriate 
housing to protect them from mechanical damage,  
shock and light. 
 

 Safety instructions: 

 

Read operating instructions thoroughly. Failure 
to comply can result in device failure, system 
damage or personal injury. 

 

According to  EN 13313 it is intended for use by 
persons having the appropriate knowledge and 
skill. 

 

R290 requires special handling and care due to 
its flammability. Sufficient ventilation is required 
during service of the system. Contact with 
rapidly expanding gases can cause frostbite and 
eye damage. Proper protective equipment 
(gloves, eye protection, etc.) has to be used. 

 

In a severely contaminated system, avoid 
breathing acid vapors and avoid contact with 
skin from contaminated refrigerant / lubricants. 
Failure to do so could result in injury. 

 

Ensure that the system is correctly  labeled with 
applied refrigerant type and a warning for 
explosion risk. 

 

Do not release any refrigerant into the 
atmosphere! 

 

Do not exceed the specified maximum ratings for 
pressure, temperature, voltage and current. 

 

Before opening any system make sure pressure 
in system is brought to and remains at 
atmospheric pressure. 

 

Ensure that the system piping is grounded.  

 

Before installation or service disconnect  all 
voltages from system and device. 

 

Observe and avoid mechanical damage of 
housing in order to maintain protection class. 

 

Ensure that design, installation and operation 
are according to European and national 
standards/regulations. 

 

Installation (Fig. 1): 

 

Mounting directions per Fig. 1 in order to prevent 
the collection of contaminant in pressure sensing 
element. 

 

 

Fig. 1 
 

Brazing (Fig. 2): 

 

Perform and consider the brazing joint as per 
EN 14324. 

 

Before and after brazing clean tubing and brazing 
joints. 

 

Minimize vibrations in the piping lines by 
appropriate solutions. 

 

Use of flux and silver rod having a minimum of 
30% silver. 

 

 

Fig. 2 

 
Pressure test: 

 

After completion of installation, a pressure test must 
be carried out according to EN 378  for systems 
which must comply with European pressure 
equipment directive 97/23/EC. 

 

Max. system test pressure: 38.5 bar. 

 Warning: 

 

Failure to do so could result in loss of refrigerant 
and personal injury. 

 

The pressure test must be conducted by skilled 
persons with due respect regarding the danger 
related to pressure

 

Tightness  test: 

Conduct  Tightness  test  according EN378-2  with 
appropriate equipment and method to identify 
tightness of external joints. The allowable leakage rate 
must be according system 

manufacturer’s 

specification. 
 

 Electrical connection: 

 

Entire electrical connections have to comply with 
local regulations. 

 

Ensure that the cables are mounted without 
tension; always leave the cable a bit loose.  

 

Ensure that cables are not mounted near sharp 
edges.  

 

Do not bend or mechanically stress the cable 
outlet, maintain a clearance of 20 mm to 
neighboring parts. 

Wiring: 

 

PT5…FLR are in compliance with European EMC 
directive and bear CE-marking.  

 

Connection cables should not be extended beyond 
standard 6m length, otherwise entire system needs 
to be verified from the system manufacturer for free 
system signal emissions and immunity for 
conformity to EMC directive and standards. 

 

Signal line should not be installed parallel with 
power lines to avoid electrical interference. 

 

Ensure polarity  for  connection  of 2-wire cable to 
controller:  

 

+24V DC to be connected to brown wire  

 

Output Signal / 0V to be connected to green wire 

 

 

 Operation: 

 

Perform a functional test of electrical circuit 
before charging the system with refrigerant. 

 

 Service / Maintenance: 

 

Defective  PT5…FLR  must be replaced; they 
cannot be repaired. 

 

Disconnect electrical power before service. 

 

Before any debrazing ensure that the flammable 
refrigerant is pumped out of the system and the 
room around the system is well vented so no 
refrigerant left. 

 

Technical data of PT5…FLR: 

 

Max. allowable working pressure PS: 

35 bar 

 

Test pressure PT:  

38.5 bar 

 

Supply voltage:  

7V...30V DC, class 2 

 

Output signal: 

4 mA…20 mA 

 

Protection class (EN 60529): 

IP65 

 

Medium temperature: 

-40°C…+100°C 

 

Ambient temperature:  

-20°C…+80°C 

 

Released/compatible for:  R290;  mineral-,  alkyl 
benzene and ester lubricants 

 

Cable length (2 wire): 

6.0 m 

 

Marking:  

-

 

CE-Mark according 2004/108/EC,  EN61326 
Emission (Group 1, Class B) and immunity 
(industrial locations) 

-

 

  II 3G Ex nC IIB T4 Gc X 

 

 
PT5 types, not listed in the following table, are not 
released for use with flammable refrigerants!  

Type                               Range 

Part No. 

PT5-30L-FLR                0…30 bar 

802 389M 

 

 

 

 

 

 

 
 

 
 

!

!

!

!

!

Emerson Climate Technologies GmbH 

www.emersonclimate.eu

 

Holzhauser Str. 180 I 13509 Berlin I Germany

 

Date: 01.10.2014 

PT5-FLR_OI_R05_ML_865901.docx

 