Piping
25
3.7
Checklist for Proper Installation
___ 1. Unpack and check received material.
___ 2. Position the Liebert XDP and secure it to the floor.
___ 3. Wire high voltage connections.
___ 4. Wire low voltage connections.
___ 5. Connect the building chilled water piping to the Liebert XDP.44Connect the Liebert XD
cooling module piping to the Liebert XDP with slope.
___ 6. Check the system for leaks.
___ 7. Hold a vacuum on the system.
___ 8. Charge the system with refrigerant.
___ 9. Make sure that all piping has proper insulation.
Содержание Liebert XDP
Страница 2: ......