Product Description
6
Figure 4
Use a forklift to remove the Liebert XDP from the skid
1.3.4 Removing the Unit from the Skid using Rigging
1. Use the center of gravity indicators on the unit to position the slings. The slings must be equally
spaced on either side of the center of gravity indicator. Refer to
Figure 5
.
2. Place slings under the unit using spaces provided between the skid deck boards.
3. Use spreader bars or an equivalent method to ensure proper protection of the unit.
4. Ensure that the panels, if attached, are well protected from the slings.
5. Remove the 12 lag bolts and two brackets that secure the unit to the skid.
6. Lift the unit off of the skid to an elevation point where the skid is not supporting the weight of the
unit.
7. Remove the skid from under the unit.
NOTE
Unit is shown without outer packaging. These instructions may be applied with the outer
packaging in place.
NOTE
If rigging is to be used to move the unit closer to the site for installation, place one or two
horizontal straps around the unit and vertical straps at mid height.
NOTE
Each lag bolt is 1-1/2" (38mm) long. They can be removed with a 9/16" socket or wrench.
Fit the forklift tines under the Liebert XDP.
Move the forklift forward
until the tines are fully
under the unit.
The forklift tines
must be equally
spaced on either
side of the center of
gravity indicator.