Battery Installation
9
5.0
B
ATTERY
I
NSTALLATION
5.1
Battery Safety Precautions
Servicing of batteries should be performed or supervised by personnel knowledgeable of batteries and
the required precautions. Keep unauthorized personnel away from batteries.
When replacing batteries, use the same number and type of batteries.
!
CAUTION
Lead-acid batteries contain hazardous materials. Batteries must be handled, transported and
recycled or discarded in accordance with federal, state and local regulations. Because lead is a
toxic substance, lead-acid batteries must be recycled rather than discarded.
Do not open or mutilate the battery or batteries. Released electrolyte is harmful to the skin
and eyes. It is toxic. Do not dispose of battery or batteries in a fire. The battery may explode.
Do not install any batteries that are cracked, leaking or show other signs of damage. Contact
Liebert Global Services or your local Liebert representative.
A battery can present a risk of electrical shock and high short circuit current. The following
precautions should be observed when working on batteries:
• Remove watches, rings and other metal objects.
• Use tools with insulated handles.
• Wear rubber gloves and boots.
• Do not lay tools or metal parts on top of batteries.
• Disconnect charging source prior to connecting or disconnecting battery terminals.
• Determine if battery is inadvertently grounded. If inadvertently grounded, remove source
of ground. Contact with any part of a grounded battery can result in electrical shock. The
likelihood of such shock will be reduced if such grounds are removed during installation
and maintenance.
Lead-acid batteries can present a risk of fire because they generate hydrogen gas. The
following procedures should be followed:
• DO NOT SMOKE when near batteries.
• DO NOT cause flame or spark in battery area.
• Discharge static electricity from body before touching batteries by first touching a grounded
metal surface.
• After replacing battery jars in a battery cabinet, replace the retaining straps that hold the
jars in place on the shelves. This will limit accidental movement of the jars and connectors
should the cabinet ever need to be repositioned or relocated. Regular maintenance of the
battery module is an absolute necessity. Periodic inspections of battery and terminal volt-
ages, specific gravity and connection resistance should be made. Strictly follow the proce-
dures outlined in the battery manufacturer’s manual, available on the manufacturer’s Web
site.
Содержание Liebert Series 610
Страница 56: ...Installation Drawings 50 Figure 31 Base mounting patterns 500kVA module 6 pulse rectifier 88 797613 16 Rev 06 ...
Страница 57: ...Installation Drawings 51 Figure 32 Base mounting patterns 500kVA module 12 pulse rectifier 88 797613 22 Rev 04 ...
Страница 63: ...Installation Drawings 57 Figure 38 Shipping split detail 500kVA 12 pulse rectifier 88 797612 01 Rev 04 ...
Страница 65: ...Installation Drawings 59 Figure 40 Shipping split detail 625 750kVA 6 pulse rectifier 88 797612 04 Rev 04 ...
Страница 67: ...Installation Drawings 61 Figure 42 Shipping split detail 625 750kVA 12 pulse rectifier 88 797612 03 Rev 05 ...
Страница 69: ...Installation Drawings 63 Figure 44 Battery power pack system 88 797616 03 Rev 08 ...
Страница 70: ...Installation Drawings 64 Figure 45 Battery power pack Size A 88 797616 01 Rev 10 ...
Страница 72: ...Installation Drawings 66 Figure 47 Outline drawing System Control Cabinet SCCT 200 1200A 88 797614 01 Rev 08 ...
Страница 74: ...Installation Drawings 68 Figure 49 Outline drawing System Control Cabinet SCCT 1600 2000A 88 797614 02 Rev 07 ...
Страница 76: ...Installation Drawings 70 Figure 51 Outline drawing System Control Cabinet SCCT 2500 3000A 88 797614 03 Rev 08 ...
Страница 78: ...Installation Drawings 72 Figure 53 Outline drawing System Control Cabinet SCCT 4000A 88 797614 04 Rev 08 ...
Страница 82: ...Installation Drawings 76 Figure 57 Control connection location diagram SCCT 96 797619 88A Rev 04 ...
Страница 103: ...Installation Drawings 97 Figure 78 Outline drawing remote status panel surface mount 88 791617 01 Rev 05 ...
Страница 104: ...Installation Drawings 98 ...
Страница 109: ...Site Planning Data Series 610 500 750kVA Multi Module Systems 103 NOTES ...
Страница 110: ...Site Planning Data Series 610 500 750kVA Multi Module Systems 104 ...
Страница 111: ......