The Liebert APM UPS can be set up for operation in Generator Mode by an Emerson Network Power
Liebert Services engineer. The setup requires connecting J9 Pin 1 to Pin 4 or connecting J9 Pin 2 to
Pin 4. The software must be configured to reflect the connection points as attached.
10.2 UPS Startup
The Liebert APM must be fully installed and commissioned before startup, and external power
isolators must be closed. Once those general conditions are met, the UPS may be started.
10.2.1 Startup Procedure
To start the UPS from a fully powered-down condition:
1. Open the external power switch.
2. Open the UPS door.
3. Connect the power supply cables.
4. Ensure the correct phase rotation.
5. Confirm that the address DIP switch of the main Liebert FlexPower assemblies are different from
each other, and they are within 1 to 6. If they are the same, adjust them to create different Liebert
FlexPower assembly addresses.
6. Close the external input circuit breaker and connect input power.
The LCD activates. The rectifier indicator flashes while the rectifier is starting. The rectifier
enters normal operation state, and after about 30 seconds, the rectifier indicator stops blinking
and is illuminated in a steady green. After initialization, the bypass static switch turns on. The
mimic LEDs appear as shown
!
WARNING
Risk of electrical shock and arc flash. Can cause property damage, injury and death.
During this procedure the output terminals will become live.
If any load equipment is connected to the UPS output terminals, please check with the load
user and ascertain whether it is safe to apply power to the load. If the load is not ready to
receive power, then ensure that it is safely isolated from the UPS output terminals.
Table 27
Dip switch matrix
FlexPower Assembly Address
Flex Power Assembly
Address Top to Bottom
DIP Switch Number Left to Right
1
2
3
4
5
6
Down
Up
Up
Down
Down
5
Up
Down
Up
Down
Down
4
Down
Down
Up
Down
Down
3
Up
Up
Down
Down
Down
2
Down
Up
Down
Down
Down
1
Up
Down
Down
Down
Down
NOTE
For standardization, if the quantity of modules in system is less than 6, for example 45kVA