12
Decommission the turbine meter
12.1
Shut down the turbine meter
Follow the steps below to shut down and disassemble the turbine meter for storage or
shipment.
WARNING
PRESSURE HAZARD
The turbine meter is subject to pressurized fluids. Depressurize the turbine meter before
disassembly.
Failure to comply may cause high pressure fluids to leak, resulting in death or serious
injury.
Procedure
1. Disconnect all power to the turbine meter and vent all line pressure.
2. Remove security wire.
3. Remove screws and top cover of the LME.
4. Disconnect wire connections from LME.
5. Disconnect the grounding cables.
6. Disconnect conduit connections to the turbine meter.
7. Remove turbine meter from line. Refer to
Safety precautions using appropriately rated lifting slings
instructions on how to lift the turbine meter.
12.2
Turbine meter disassembly/assembly
Follow the recommendations below before disassembling the turbine meter for storage or
assembling it for shipment.
•
Label all parts or place parts in labeled containers during disassembly.
•
Do not use metal clamping devices in direct contact with any turbine meter part or
surface.
•
Rotor blades determine accurate flow measurement and should be handled with
extreme care. Bending or altering the blades in any way can affect turbine meter
accuracy.
Thoroughly clean the turbine meter inside the housing components and store or ship as it
was received. Refer to
.
After the meter is shut down, refer to
Electronics enclosure disassembly
for the detailed disassembly/assembly procedures.
User manual
Decommission the turbine meter
P/N 3-9008-515
March 2019
User manual
103
Содержание Daniel Series
Страница 1: ...User manual P N 3 9008 515 Rev AF March 2019 Daniel Series 1500 Liquid Turbine Meter NPS 3 through 24 ...
Страница 2: ...2 ...
Страница 11: ...Part I Plan User manual Plan P N 3 9008 515 March 2019 User manual 11 ...
Страница 12: ...Plan User manual March 2019 P N 3 9008 515 12 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 69: ...Part II Install User manual Install P N 3 9008 515 March 2019 User manual 69 ...
Страница 70: ...Install User manual March 2019 P N 3 9008 515 70 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 78: ...Testing User manual March 2019 P N 3 9008 515 78 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 79: ...Part III Operate User manual Operate P N 3 9008 515 March 2019 User manual 79 ...
Страница 80: ...Operate User manual March 2019 P N 3 9008 515 80 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 83: ...Part IV Maintain User manual Maintain P N 3 9008 515 March 2019 User manual 83 ...
Страница 84: ...Maintain User manual March 2019 P N 3 9008 515 84 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 105: ...User manual P N 3 9008 515 March 2019 User manual 105 ...